SQ250 <strong>FLK</strong> <strong>Gas</strong> <strong>Sampling</strong> <strong>System</strong><br />
The purging duration should be kept as short as possible. However, it should be ensured that after purging, the low pressure,<br />
if present, returns to its normal value.<br />
It is therefore practical to match the purging duration and interval to local conditions.<br />
- Setting the purging duration<br />
• In order to prevent initiation of purging due to the expired purging interval time, this time must be temporarily set to a<br />
high value (CTR 1 to 300 minutes for example).<br />
• After approx. -0.08 bar is obtained, the purging process is started.<br />
• Then the low pressure is checked on the pressure gauge.<br />
• If the low pressure is the same as previously, then the purging duration (CTR 3) can be left as it is.<br />
- Setting the purging interval period:<br />
• In order to prevent initiation of purging due to the expired purging interval time, this time must be temporarily set to a<br />
high value (CTR 1 to 300 minutes for example).<br />
• Then it must be found how long it takes on average until the low pressure in the measuring gas line has reached approx.<br />
-0.08 bar. The low pressure can be read on the pressure gauge in the valve combination.<br />
• The time that has passed since the last purging can be read out from the CTR 1 in minutes using the OP3 Operating<br />
Panel.<br />
• The value obtained in minutes can now be entered in the CTR 1.<br />
• The limit contact in the pressure gauge for the release of the purging by low pressure should<br />
be set to -0.15 bar.<br />
If during longer operation an increasingly shorter purging interval period is found, then the low pressure must be checked<br />
directly after purging. If the low pressure does not correspond to the normal value and no fault can be found, the purging<br />
duration in the CTR 3 can be increased to 8 sec.<br />
4.3 Leakage test<br />
This should be carried out every six months or after each manual cleaning of the measuring gas line and after replacement or<br />
repair of various parts in the measuring gas line. ( pump, filter, gas cooler, etc.).<br />
To simplify the low-pressure ( leakage ) test of the complete system a method has been provided in the programmable logic<br />
controller of appropriately controlling the measuring gas four-way ball valve and the measuring gas pump.<br />
Here two procedures must be carried out:<br />
4.3.1. Leakage test between the four-way ball valve and the measuring gas pump<br />
4.3.2. Leakage test of the probe, filter and condensate vessel.<br />
When doing this, it is essential that the first test is correctly concluded and the sealing of the measuring gas connection is<br />