SQ255 Control Unit<br />
3. Operation<br />
3.1 General information<br />
This equipment unit has been supplied functionally tested. Therefore, no complicated checks of the separately installed<br />
devices are needed.<br />
3.2 Start-up<br />
Warning!<br />
The control cabinet in conjunction with the rest of the unit must only be put into operation by<br />
qualified personnel, who are familiar with all maintenance measures.<br />
Unauthorized operation and improperly carried out start-up procedures can cause damage.<br />
The start-up is mainly restricted to a check of the wiring, a functional check and a leakage test of the complete<br />
measuring equipment.<br />
3.2.1 Electrical start-up<br />
After checking the wiring to the heat exchanger, valve box, analyzer cabinet and control station, the following<br />
functional checks can be carried out.<br />
• Check that all external units such as heat exchanger and analyzer cabinet switched off.<br />
• Check that the area around the <strong>FLK</strong> sampling probe, including the traverse path, is closed off and provided with<br />
warning signs about the high temperature (up to 250° C) of the probe, coolant pipe and cooler as well as the<br />
automatic traversing.<br />
• Turn on main switch (S1), Circuit breaker (FA1) for heat exchanger, motor protection switch (Q1).<br />
• Turn on main switch (S2), Circuit breaker (F1/F2/F3).<br />
• Check that all external units powered up, also OP3 and SIMATIC S7 energized.<br />
4. Maintenance<br />
The control cabinet is maintenance free.<br />
Copyright ® SIEMENS Page 91 04/04