SQ250 <strong>FLK</strong> <strong>Gas</strong> <strong>Sampling</strong> <strong>System</strong><br />
The four-way ball valve is moved to the "Closed" position with the probe withdrawn.<br />
The measuring gas pump is only in operation with the probe inserted, when a minimum coolant temperature of 130°C has<br />
been reached and when the measuring gas filter has reached its operating temperature.<br />
3.2.4 Heat exchanger unit<br />
See also the operating manual for the heat exchanger unit.<br />
After checking the electrical functions, the signal interchange to the controller and the coolant lines, the following settings for<br />
the coolant circuit must be checked and adjusted.<br />
Settings on the limit monitor:<br />
Coolant temperature, min.: 130°C<br />
Fan starts at : 180°<br />
Coolant temperature, max.: 220°C<br />
Switching hysteresis 2°C<br />
Set value for three-way valve: 140°C<br />
The precise settings are derived from the operating values over a longer period of time and may vary from system to system.<br />
Note:<br />
Do not open the shut-off valves on the venting containers when the pump is stationary unless really<br />
necessary, because otherwise air will enter the closed coolant circuit.<br />
3.2.5 Probe with retraction device<br />
In order to be able to begin with the insertion of the probe, the parameters in the PLC controller must be checked according to<br />
the "Controller" operating manual.<br />
Danger: During automatic or manual traversing of the probe, no unauthorized personnel should be present in the<br />
immediate vicinity of the probe, the kiln connection pipe and the retraction device.<br />
Note: The "EXTERNAL" release must be present ("1" signal on the PLC Input 4.6).<br />
Then a start can be made on the insertion of the probe into the kiln or precalcination chamber.<br />
• Set the manual / automatic switch to manual;<br />
• Uninterrupted pressing of the button "Insert probe";<br />
It is essential to check the following:<br />
• all moving parts such as coolant hoses, measuring gas line and electrical feeders.<br />
• the open Kiln connection piece<br />
• the proper functioning of the dust blow-back system (TMR 3,4,11)<br />
• coolant flow (heat exchanger unit, Lamp H6), flow measurement always on max. indication<br />
• coolant level min. (heat exchanger unit, Lamp H7)<br />
• pump fault (heat exchanger unit, Lamp H2)<br />
Copyright ® SIEMENS Page 19 04/04