SQ250 <strong>FLK</strong> <strong>Gas</strong> <strong>Sampling</strong> <strong>System</strong><br />

4. Maintenance<br />

4.1 General information<br />

The following maintenance work must be carried out by the user to keep the equipment in an operational state: The sampling<br />

device, drive motor, traverse rails, valve combination and heat exchanger unit must be thoroughly cleaned of dust and dirt at<br />

least once per week.<br />

• When restarting the Kiln in the first month, the probe should be checked for baked-on deposits and damage each time it<br />

is withdrawn. and also when significant changes to the raw meal mixture occur.<br />

• Regular checking of the coolant circuit.<br />

• Compressed-air and measuring-gas lines, limit switches and particularly the moving parts must be checked for damage<br />

and repaired or renewed if necessary.<br />

- Checks to the cooling circuit<br />

• Here, the flow and level of the coolant fluid should be checked. If required, the coolant should be topped up. As an aid<br />

there is a level mark for 180°C on the expansion vessel. If this is undercut at the corresponding temperature, the<br />

coolant should be topped up.<br />

• If the level mark "min." is undercut in the hot condition, then it is essential to closely examine the cooling system for<br />

leakage. This may occur on the heat exchanger unit, connection hoses or on and in the probe.<br />

• Any unsealed points must be rectified as soon as possible.<br />

• If the flow indicator is no longer in the maximum range, the coolant filter must be removed and cleaned.<br />

The check of the measuring gas line is mainly just a visual check. Here, attention should be given to any water pockets,<br />

blockages or damage that has arisen.<br />

The flow in the analyzer unit should also be checked. A reducing flow indicates that the measuring gas lines are becoming<br />

choked.<br />

An interval of one week between checks is recommended.<br />

Note: Further maintenance measures can be taken from the operating manuals of the separate components.<br />

4.2 Optimizing the complete equipment<br />

It is imperative that optimization of the complete equipment is carried out after start-up.<br />

This can however only take place with normal operation of the kiln or precalcination facility and after the addition of the raw<br />

meal. Optimization involves the following points:<br />

4.2.1 Probe cooling circuit<br />

4.2.2 Automatic insertion / retraction of the probe<br />

4.2.3 Purging duration and interval<br />

Copyright ® SIEMENS Page 22 04/04