14.03.2017 Views

Study on feasibility of SATCOM for railway communication

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Final Report<br />

Support <strong>for</strong> handheld terminals<br />

Yes<br />

No<br />

7.2.3 Questi<strong>on</strong>s <strong>for</strong> <strong>railway</strong> stakeholders<br />

7.2.3.1 GSM-R evoluti<strong>on</strong><br />

Figure 58: Support <strong>for</strong> handheld terminals<br />

Most <strong>of</strong> the Survey participants reported bel<strong>on</strong>ging to working groups dedicated to <strong>railway</strong><br />

communicati<strong>on</strong>s:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

UIC (ERIG, FM WG, FRMCS…)<br />

GSM-R Industry Group<br />

ERTMS<br />

ETSI (NG2R)<br />

SHIFT2RAIL X2RAIL-1 WP3 and CONNECTA WP2<br />

TCNOpen<br />

ROC Industry Group<br />

Agency WP/WGs<br />

3GPP<br />

EUG Security WG<br />

EUAR<br />

EIM<br />

CER C<strong>on</strong>trol-Command & Signalling Support Group<br />

Doc.Nº: SRAIL-FNR-010-IND<br />

Edit./Rev.: 1/1<br />

Date: 16/02/2017<br />

Page 117 <strong>of</strong> 285

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!