Final Report<br />

<br />

<br />

Survey <strong>on</strong> operati<strong>on</strong>al communicati<strong>on</strong>s (study <strong>for</strong> the evoluti<strong>on</strong> <strong>of</strong> the <strong>railway</strong> communicati<strong>on</strong>s<br />

system), Ref: 37760-496v04 [RD-17]<br />

CCS TSI (Technical specificati<strong>on</strong>s <strong>for</strong> interoperability) – EU Decisi<strong>on</strong> 2012/88/EU<br />

CRT-NONT-3 The proposed <strong>SATCOM</strong> system <strong>for</strong> the future <strong>railway</strong> communicati<strong>on</strong>s architecture<br />

shall provide at least an acceptable level <strong>of</strong> cost efficiency, taking into account full lifecycle costs<br />

covering the full lifespan <strong>of</strong> the selected soluti<strong>on</strong>, and as l<strong>on</strong>g as technical and functi<strong>on</strong>al<br />

requirements allow <strong>for</strong> this opti<strong>on</strong>.<br />

RATIONALE<br />

Costs are a key decisi<strong>on</strong> driver <strong>for</strong> the selecti<strong>on</strong> <strong>of</strong> a new communicati<strong>on</strong> system. The future<br />

system shall have at least an ―Acceptable‖ cost efficiency. This is due to the fact that, despite<br />

costs not being the key driver <strong>for</strong> such a system, it should not have a worse costs per<strong>for</strong>mance<br />

than the existing GSM-R system.<br />

The cost-efficiency <strong>of</strong> the system has been defined according to several key influencing factors<br />

which have an impact <strong>on</strong> the CapEx and OpEx values.<br />

<br />

<br />

<br />

Use <strong>of</strong> Commercial Off the Shelf equipment: The use <strong>of</strong> commercial equipment allows <strong>for</strong> a<br />

reducti<strong>on</strong> <strong>of</strong> the costs <strong>of</strong> both procuring and operating equipment.<br />

Dedicated infrastructure/Potential <strong>for</strong> added value services. The potential <strong>for</strong> sharing<br />

infrastructure with other systems and/or providing additi<strong>on</strong>al services which could be<br />

m<strong>on</strong>etized.<br />

Durati<strong>on</strong> <strong>of</strong> deployment: The l<strong>on</strong>ger the deployment time the less time infrastructure is made<br />

use <strong>of</strong> and l<strong>on</strong>ger that legacy systems have to be kept in place.<br />

Cost-Efficiency<br />

High<br />

Acceptable<br />

Descripti<strong>on</strong><br />

A fully COTS based system allows <strong>for</strong> a reducti<strong>on</strong> in both CapEx<br />

and OpEx due to larger volumes, higher industrial competiti<strong>on</strong><br />

and resulting lower costs both <strong>for</strong> infrastructure and systems<br />

investments as well as <strong>for</strong> direct running costs.<br />

The use <strong>of</strong> infrastructure (spectrum, terminals) which is shared<br />

with other services and allows <strong>for</strong> direct revenue from the system.<br />

This includes commercial services such as passenger<br />

communicati<strong>on</strong>s.<br />

Deployment time <strong>of</strong> 5 years or less <strong>for</strong> average Member State.<br />

A modified <strong>of</strong>f the shelf system allows <strong>for</strong> leveraging from existing<br />

standards, but due to the COTS soluti<strong>on</strong> not fulfilling all necessary<br />

requirements, requires certain specific modificati<strong>on</strong>s.<br />

Some infrastructure can be leveraged to provide additi<strong>on</strong>al<br />

services outside <strong>of</strong> the <strong>on</strong>es required.<br />

Deployment time <strong>of</strong> approximately 10 years <strong>for</strong> average Member<br />

State.<br />

Doc.Nº: SRAIL-FNR-010-IND<br />

Edit./Rev.: 1/1<br />

Date: 16/02/2017<br />

Page 201 <strong>of</strong> 285