14.03.2017 Views

Study on feasibility of SATCOM for railway communication

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Final Report<br />

Inmarsat 4 (BGAN) - Inmarsat 6 (ICE)<br />

Criteri<strong>on</strong> ID Criteri<strong>on</strong> Evaluati<strong>on</strong> Justificati<strong>on</strong><br />

CRT-TECH-6<br />

Network registrati<strong>on</strong> delay <strong>for</strong> the proposed satcom system<br />

shall be Normal (with similar values <strong>of</strong> current GSM-R system).<br />

NC<br />

Inmarsat 4 (BGAN) terminals requires "2 registrati<strong>on</strong> processes" to be able to use<br />

Packet Switched services.<br />

Each I-4 satellite can generate 19 wide beams and more than 200 narrow spotbeams.<br />

These beams can be quickly rec<strong>on</strong>figured and focused anywhere <strong>on</strong> Earth<br />

to provide extra capacity where needed.<br />

The BGAN system requires 2 step c<strong>on</strong>necti<strong>on</strong> process. The first step is to Register<br />

with the Network, which is opening a wide beam c<strong>on</strong>necti<strong>on</strong> with <strong>on</strong>e <strong>of</strong> the I-4<br />

satellites. After registrati<strong>on</strong>, the BGAN terminal's ph<strong>on</strong>e and SMS messaging<br />

services are operati<strong>on</strong>al (Circuit Switched). The BGAN may place or receive voice<br />

calls or sms messages to any<strong>on</strong>e in the world.<br />

The sec<strong>on</strong>d step is opening a Data Sessi<strong>on</strong> (Packet Switched), such as a<br />

c<strong>on</strong>necti<strong>on</strong> to the Internet. When this happens, the BGAN terminal is c<strong>on</strong>necting to<br />

a Narrow Beam <strong>of</strong> the same I-4 satellite.<br />

In additi<strong>on</strong>, within the terminal comparis<strong>on</strong> study per<strong>for</strong>med by TelAstra [RD-22], it<br />

is shown that the registrati<strong>on</strong> time <strong>of</strong> the BGAN IsatPh<strong>on</strong>e Pro takes a lot <strong>of</strong> time<br />

(between 72 to 120 sec<strong>on</strong>ds) because it needs first to fix its positi<strong>on</strong> by means <strong>of</strong><br />

the GPS system. Despite this first acquisiti<strong>on</strong> is expected to be improved, it is <strong>on</strong>ly<br />

the first step <strong>of</strong> the registrati<strong>on</strong> process (in fact satph<strong>on</strong>es <strong>on</strong>ly executes this first<br />

step since they <strong>on</strong>ly provide service by means <strong>of</strong> the Circuit Switched system.<br />

Doc.Nº: SRAIL-FNR-010-IND<br />

Edit./Rev.: 1/1<br />

Date: 16/02/2017<br />

Page 234 <strong>of</strong> 285

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!