14.03.2017 Views

Study on feasibility of SATCOM for railway communication

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Final Report<br />

C.7 <strong>SATCOM</strong> SOLUTION 7: GEO / C-BAND BASED ON DVB-S2X / DVB-RCS2<br />

GEO / C-band<br />

Criteri<strong>on</strong> ID Criteri<strong>on</strong> Evaluati<strong>on</strong> Justificati<strong>on</strong><br />

CRT-TECH-1<br />

The “link availability” <strong>of</strong> the proposed satcom system shall be<br />

High.<br />

C (Low)<br />

Link availabilities in GEO C-band systems (taking into account satellite parameter<br />

from current deployments) can be reached when adequate terminal per<strong>for</strong>mances<br />

are selected (e.g. BUC power, antenna size/type and modem c<strong>on</strong>figurati<strong>on</strong>) and<br />

c<strong>on</strong>sidering the maximum data rate (i.e. low date rate) <strong>of</strong> the <strong>railway</strong> applicati<strong>on</strong>s<br />

assumed in the scope <strong>of</strong> this assessment.<br />

CRT-TECH-2 The “reliability” <strong>of</strong> the proposed satcom system shall be High. C (High)<br />

Satellites are in general designed with a very high reliability, since they cannot be<br />

repaired. In additi<strong>on</strong>, and c<strong>on</strong>sidering that lots <strong>of</strong> satcom soluti<strong>on</strong>s currently<br />

deployed are based <strong>on</strong> GEO/C-band systems, redundancy can be assumed <strong>for</strong> a<br />

possible GEO soluti<strong>on</strong> operating the C-band.<br />

For ground segment elements, mechanisms such as redundancy and backup can<br />

be used in order to increase reliability.<br />

Finally, MTBF and MTTR requirements shall be c<strong>on</strong>sidered when designing<br />

<strong>railway</strong> terminals in order to comply with reliability criteri<strong>on</strong>.<br />

CRT-TECH-3<br />

The end-to-end error ratio <strong>of</strong> the proposed satcom system shall<br />

be Low.<br />

Note: Since this criteri<strong>on</strong> <strong>on</strong>ly c<strong>on</strong>siders the satellite system,<br />

the error ratio shall be measured after the last satellite<br />

communicati<strong>on</strong><br />

C<br />

DVB-S2X/RCS2 standards provides mechanisms to guarantee high level <strong>of</strong><br />

service c<strong>on</strong>tinuity implementing mechanisms such as FEC, LL-FEC,<br />

retransmissi<strong>on</strong>s (ARQ), etc. There<strong>for</strong>e, this GEO/C-band soluti<strong>on</strong> based <strong>on</strong> these<br />

standards is able to provide a low end-to-end error ratio.<br />

Doc.Nº: SRAIL-FNR-010-IND<br />

Edit./Rev.: 1/1<br />

Date: 16/02/2017<br />

Page 255 <strong>of</strong> 285

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!