14.03.2017 Views

Study on feasibility of SATCOM for railway communication

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Final Report<br />

N<strong>on</strong>-technical and n<strong>on</strong>-functi<strong>on</strong>al criteria<br />

Criteri<strong>on</strong> ID<br />

CRT-NONT-1<br />

CRT-NONT-2<br />

CRT-NONT-3<br />

CRT-NONT-4<br />

CRT-NONT-5<br />

Criteri<strong>on</strong><br />

The proposed <strong>SATCOM</strong> system <strong>for</strong> the future <strong>railway</strong> communicati<strong>on</strong>s architecture shall have a<br />

universally assumed sustained lifecycle covering the total timespan <strong>of</strong> the FRMCS without risk<br />

<strong>of</strong> obsolescence. Due to current estimates <strong>of</strong> migrati<strong>on</strong> from GSM-R, roll-out <strong>of</strong> the next<br />

generati<strong>on</strong> systems is expected around the year 2022. Taking into account reference lifecycles<br />

<strong>of</strong> such systems, a sustainability <strong>of</strong> minimum 15 years is expected after this date.<br />

The proposed <strong>SATCOM</strong> system <strong>for</strong> the future <strong>railway</strong> communicati<strong>on</strong>s architecture shall provide<br />

<strong>for</strong> easy serviceability that has minimal impact <strong>on</strong> operati<strong>on</strong>s, whether it is due to scheduled or<br />

unscheduled maintenance/repair. Additi<strong>on</strong>ally, the system shall ensure that technical and multitechnology<br />

criteria compliance is maintained within the required limits throughout the lifetime <strong>of</strong><br />

the assemblies. However, during preventative or corrective maintenance, the subsystem may not<br />

be able to respect the values quoted in the Basic Parameters; the maintenance rules shall<br />

ensure that safety is not prejudiced during these activities.<br />

The proposed <strong>SATCOM</strong> system <strong>for</strong> the future <strong>railway</strong> communicati<strong>on</strong>s architecture shall provide<br />

at least an acceptable level <strong>of</strong> cost efficiency, taking into account full lifecycle costs covering<br />

the full lifespan <strong>of</strong> the selected soluti<strong>on</strong>, and as l<strong>on</strong>g as technical and functi<strong>on</strong>al requirements<br />

allow <strong>for</strong> this opti<strong>on</strong>.<br />

The proposed <strong>SATCOM</strong> system <strong>for</strong> the future <strong>railway</strong> communicati<strong>on</strong>s architecture shall<br />

dem<strong>on</strong>strate <strong>for</strong>ecasted full lifecycle costs that are, by all acceptable estimates, not higher than<br />

those <strong>of</strong> GSM-R.<br />

The proposed <strong>SATCOM</strong> system <strong>for</strong> the future <strong>railway</strong> communicati<strong>on</strong>s architecture shall<br />

dem<strong>on</strong>strate a <strong>for</strong>ecasted full lifecycle ec<strong>on</strong>omic internal rate <strong>of</strong> return (IRR, alternatively<br />

ERR) above the average minimum acceptable rate <strong>of</strong> return (MARR) set by the target Member<br />

States <strong>for</strong> public investments.<br />

Standards shall be used to the extent possible to ensure interoperability <strong>of</strong> the proposed<br />

<strong>SATCOM</strong> system <strong>for</strong> the future <strong>railway</strong> communicati<strong>on</strong>s architecture with communicati<strong>on</strong><br />

systems (satellite, terrestrial and possible gap fillers). Additi<strong>on</strong>ally, the mandatory standards<br />

listed in this table shall be applied in the certificati<strong>on</strong> process:<br />

CRT-NONT-6<br />

CRT-NONT-7<br />

EN 50126 Railway applicati<strong>on</strong>s — The specificati<strong>on</strong> and dem<strong>on</strong>strati<strong>on</strong> <strong>of</strong><br />

reliability, availability, maintainability and safety (RAMS)<br />

EN 50128 Railway applicati<strong>on</strong>s — Communicati<strong>on</strong>, signalling and processing<br />

systems — S<strong>of</strong>tware <strong>for</strong> <strong>railway</strong> c<strong>on</strong>trol and protecti<strong>on</strong> systems<br />

EN 50129 Railway applicati<strong>on</strong>s — Communicati<strong>on</strong>, signalling and processing<br />

systems — Safety related electr<strong>on</strong>ic systems <strong>for</strong> signaling<br />

EN 50159 Railway applicati<strong>on</strong>s — Communicati<strong>on</strong>, signalling and processing<br />

systems — Safety-related communicati<strong>on</strong> in transmissi<strong>on</strong> systems<br />

The proposed <strong>SATCOM</strong> system <strong>for</strong> the future <strong>railway</strong> communicati<strong>on</strong>s architecture shall hold at<br />

least a universally accepted technology readiness level (TRL) <strong>of</strong> 7 or above.<br />

Table 15: N<strong>on</strong>-technical and n<strong>on</strong>-functi<strong>on</strong>al criteria identified<br />

Doc.Nº: SRAIL-FNR-010-IND<br />

Edit./Rev.: 1/1<br />

Date: 16/02/2017<br />

Page 63 <strong>of</strong> 285

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!