14.03.2017 Views

Study on feasibility of SATCOM for railway communication

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Final Report<br />

Latency<br />

Bandwidth<br />

25<br />

20<br />

15<br />

10<br />

5<br />

CA<br />

PA<br />

BA<br />

CSA<br />

30<br />

25<br />

20<br />

15<br />

10<br />

5<br />

CA<br />

PA<br />

BA<br />

CSA<br />

0<br />

PSA 0<br />

PSA<br />

Low Normal N/A<br />

High Medium Low N/A<br />

Reliability<br />

Setup Time<br />

30<br />

20<br />

10<br />

0<br />

High<br />

Normal<br />

CA<br />

PA<br />

BA<br />

CSA<br />

PSA<br />

25<br />

20<br />

15<br />

10<br />

5<br />

0<br />

Normal Immediate N/A<br />

CA<br />

PA<br />

BA<br />

CSA<br />

PSA<br />

Figure 9: Railway applicati<strong>on</strong>s <strong>for</strong> the FRMCS - communicati<strong>on</strong> attributes: Latency, Bandwidth,<br />

Reliability and Setup time – QoS Perfomances<br />

Doc.Nº: SRAIL-FNR-010-IND<br />

Edit./Rev.: 1/1<br />

Date: 16/02/2017<br />

Page 43 <strong>of</strong> 285

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!