Final Report<br />

9.3.2.4 Cost Model<br />

The cost model is built by segmenting each subsystem influencing the costs. The breakdown<br />

subsystem scheme <strong>for</strong> the model is shown in Figure 71.<br />

Timing Elements<br />

Start Year<br />

Durati<strong>on</strong><br />

Operati<strong>on</strong>al Model<br />

Data rates<br />

Bandwidth<br />

Tariffs<br />

Deployment Model<br />

#Terminals<br />

#km <strong>of</strong> rail<br />

#Gapfillers<br />

<strong>SATCOM</strong> Terrestrial Base stati<strong>on</strong>s<br />

Frequencies<br />

Orbit<br />

CAPEX OPEX CAPEX<br />

OPEX<br />

9.3.2.4.1 Timing Elements<br />

Figure 71: Cost model subsystem breakdown<br />

The time framework defined in the model c<strong>on</strong>templates the period between 2020 and 2040. The<br />

investment and maintenance costs have been computed <strong>for</strong> the provisi<strong>on</strong> <strong>of</strong> the service during the<br />

whole period. As menti<strong>on</strong>ed previously, operati<strong>on</strong>al costs are charged recurrently and will have an<br />

impact <strong>on</strong> the yearly investment requirements. On the other hand, capital expenses, by definiti<strong>on</strong>, are<br />

<strong>on</strong>e-time investments at the beginning <strong>of</strong> the period. Nevertheless, the systems reach an end <strong>of</strong> life<br />

and they require eventual replacement. This replacement is defined by the lifecycles <strong>of</strong> the system<br />

described in the table below. There are some restricti<strong>on</strong>s <strong>on</strong> CAPEX investments when the technology<br />

is close to obsolescence. Hence, no re-investment is per<strong>for</strong>med after 2035.<br />

<strong>SATCOM</strong><br />

Lifecycle<br />

Rolling Stock Operator Trainset Devices Lifecycle<br />

Rolling Stock Operator Handheld Devices Lifecycle<br />

Infrastructure Manager Gap Filler - <strong>SATCOM</strong> Side Lifecycle<br />

Infrastructure Manager <strong>SATCOM</strong> Hub Lifecycle<br />

Value<br />

12 years<br />

12 years<br />

12 years<br />

12 years<br />

Doc.Nº: SRAIL-FNR-010-IND<br />

Edit./Rev.: 1/1<br />

Date: 16/02/2017<br />

Page 143 <strong>of</strong> 285

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!