14.03.2017 Views

Study on feasibility of SATCOM for railway communication

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Final Report<br />

Terrestrial<br />

Lifecycle<br />

Railway Undertaking Trainset Devices Lifecycle<br />

Railway Undertaking Handheld Devices Lifecycle<br />

Infrastructure Manager Base Stati<strong>on</strong>s Lifecycle<br />

Value<br />

12 years<br />

12 years<br />

12 years<br />

Table 35: Lifecycle c<strong>on</strong>cepts defined in the model<br />

9.3.2.4.2 Operati<strong>on</strong>al Model<br />

The operati<strong>on</strong>al model quantifies the total data rate and bandwidth used by the rail sector in Europe. It<br />

also takes into account the communicati<strong>on</strong> tariffs depending <strong>on</strong> each technology.<br />

9.3.2.4.3 Deployment Model<br />

The deployment model quantifies the km <strong>of</strong> rail present in Europe, the number <strong>of</strong> terminals required,<br />

gap fillers, <strong>SATCOM</strong> hubs and base stati<strong>on</strong>s.<br />

9.3.2.4.4 Formulati<strong>on</strong> <strong>of</strong> the model<br />

As menti<strong>on</strong>ed previously, the model is structured in terms <strong>of</strong> CAPEX and OPEX cost <strong>for</strong> each soluti<strong>on</strong><br />

group (terrestrial or <strong>SATCOM</strong>). In this secti<strong>on</strong>, flow diagrams will be used to detail how the cost model<br />

has been built and how the costs have been modelled.<br />

9.3.2.4.4.1 CAPEX<br />

The CAPEX costs <strong>for</strong> terrestrial and <strong>SATCOM</strong> exhibit significant similarities regarding terminal costs.<br />

Each technology has its own terminal price and investment requirements. Nevertheless, the same<br />

strategy has been applied <strong>for</strong> both soluti<strong>on</strong> groups. The main difference between terrestrial and<br />

<strong>SATCOM</strong> regarding CAPEX costs is that the <strong>SATCOM</strong> soluti<strong>on</strong> requires gap fillers while terrestrial<br />

requires base stati<strong>on</strong>s.<br />

Figure 72 shows the flow diagrams <strong>for</strong> computing the CAPEX depending <strong>on</strong> the soluti<strong>on</strong> group.<br />

Doc.Nº: SRAIL-FNR-010-IND<br />

Edit./Rev.: 1/1<br />

Date: 16/02/2017<br />

Page 144 <strong>of</strong> 285

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!