14.03.2017 Views

Study on feasibility of SATCOM for railway communication

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Final Report<br />

- All the soluti<strong>on</strong>s are compliant with the multi-technology criteri<strong>on</strong>, meaning that all <strong>of</strong> them can be<br />

integrated within a FRMCS c<strong>on</strong>sisting <strong>of</strong> several communicati<strong>on</strong>s systems (i.e. heterogeneous<br />

technologies) and allowing the c<strong>on</strong>vergence <strong>of</strong> networks that would enable a multi-link scenario.<br />

- The system technically best evaluated (the MEO/C-band soluti<strong>on</strong>) is also the worst evaluated<br />

n<strong>on</strong>-technically. It is because <strong>of</strong> the MEO/C-band is nowadays <strong>on</strong>ly a theoretical soluti<strong>on</strong> 19 .<br />

- The IRIS FOC soluti<strong>on</strong> has a similar behaviour than the MEO/C-band, since its technical<br />

evaluati<strong>on</strong> is highly positive (<strong>on</strong>ly with a bad grade <strong>on</strong> the double-hop delay required in voice<br />

applicati<strong>on</strong>s). In additi<strong>on</strong>, this soluti<strong>on</strong> is currently planned, although from 2025.<br />

- Some <strong>of</strong> the other systems best positi<strong>on</strong>ed, the GEO/C-band soluti<strong>on</strong>, has main problems <strong>on</strong> the<br />

double-hop delay, handhelds and security but, <strong>on</strong> the other hand, its n<strong>on</strong>-technical evaluati<strong>on</strong> is<br />

largely positive.<br />

Criteri<strong>on</strong> ID<br />

1 2 3 4 5 6 7 8 9 10 11<br />

Iridium NEXT<br />

MEO / C-band<br />

Inmarsat 4 (BGAN)<br />

- Inmarsat 6 (ICE)<br />

Satcom technology<br />

IRIS FOC Thuraya GEO / S-band GEO / C-band GEO / X-band SmartLNB GEO / Ku-band<br />

Inmarsat 5<br />

(Global Xpress)<br />

CRT-TECH-1 NC C NC C (Low) NC C (Low) C (Low) NC NC NC NC<br />

CRT-TECH-2 C (Low) C (High) C (Low) C (High) C (Low) C (Low) C (High) C (High) C (High) C (High) C (High)<br />

CRT-TECH-3 C C C C C C C C C C C<br />

CRT-TECH-4a C (High) C (High) NC C (Low) C (Low) NC C (Low) C (Low) NC C (Low) C (Low)<br />

CRT-TECH-4b C (High) C (High) NC NC NC NC NC NC NC NC NC<br />

CRT-TECH-5 C (High) C (High) C (Low) C (Low) C (Low) C (Low) C (Low) C (Low) C (Low) C (Low) C (Low)<br />

CRT-TECH-6 C C NC C C C C C C C NC<br />

CRT-TECH-7 NC C NC C (High) NC C (High) C C C (High) C C<br />

CRT-TECH-8 NC C PC C NC C C C C C C<br />

CRT-TECH-9 C C C C C C C C C C C<br />

CRT-TECH-10 C C C C (Low) C PC C C PC C C<br />

CRT-TECH-11 C C C C (Low) C (Low) C (Low) C C C C (High) C (High)<br />

CRT-TECH-12 NC C NC C NC C C C C C NC<br />

CRT-TECH-13 C C C C C C C C C C C<br />

CRT-TECH-14 C C C C NC C C C PC C C<br />

CRT-TECH-15 C (Low) C (High) C C (Low) C (Low) C (Low) C (High) C (High) C (Low) C (High) C (High)<br />

CRT-TECH-16 C (Low) C (Low) C (Low) C (Low) NC C (Low) C (High) C C (High) C (High) C (Low)<br />

CRT-TECH-17 C (Low) C C (Low) PC C (Low) C PC PC PC PC PC<br />

CRT-TECH-18 C (Low) C (High) C (High) C (High) C (Low) C (High) C (High) C (High) C (High) C (High) C (High)<br />

CRT-TECH-19 NC NC C NC NC PC NC NC PC NC NC<br />

CRT-MULT-1 C (Low) C (High) C (Low) C C (Low) C C (High) C (High) C C (High) C (High)<br />

CRT-NONT-1 PC NC C NC PC PC C C C C PC<br />

CRT-NONT-2 C C C C C C C PC PC PC PC<br />

CRT-NONT-3 C NC C PC C C C C C C C<br />

CRT-NONT-4 C C C N/A N/A N/A C N/A C C N/A<br />

CRT-NONT-5 C C C N/A N/A N/A C N/A C C N/A<br />

CRT-NONT-6 PC C PC C PC PC PC PC PC PC PC<br />

CRT-NONT-7 C NC PC NC C C C C C C C<br />

Figure 91: Complete compliance matrix<br />

Figure 92 shows a comparis<strong>on</strong> am<strong>on</strong>g the different <strong>SATCOM</strong> soluti<strong>on</strong>s analysed. The graph shows a<br />

―total score‖ computed taking into account the complete compliance matrix <strong>of</strong> Figure 91 20 .<br />

19<br />

Despite the MEO/C-band is <strong>on</strong>ly a theoretical soluti<strong>on</strong>, a similar soluti<strong>on</strong> exists nowadays. It is a MEO/S-band (ICO), which is<br />

currently reaching its end <strong>of</strong> life.<br />

20<br />

Results have been calculated assigning a score <strong>of</strong> 1 point to PC and 2 points to compliant evaluati<strong>on</strong>s.<br />

Doc.Nº: SRAIL-FNR-010-IND<br />

Edit./Rev.: 1/1<br />

Date: 16/02/2017<br />

Page 173 <strong>of</strong> 285

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!