Study on feasibility of SATCOM for railway communication
SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216
SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Final Report<br />
- All the soluti<strong>on</strong>s are compliant with the multi-technology criteri<strong>on</strong>, meaning that all <strong>of</strong> them can be<br />
integrated within a FRMCS c<strong>on</strong>sisting <strong>of</strong> several communicati<strong>on</strong>s systems (i.e. heterogeneous<br />
technologies) and allowing the c<strong>on</strong>vergence <strong>of</strong> networks that would enable a multi-link scenario.<br />
- The system technically best evaluated (the MEO/C-band soluti<strong>on</strong>) is also the worst evaluated<br />
n<strong>on</strong>-technically. It is because <strong>of</strong> the MEO/C-band is nowadays <strong>on</strong>ly a theoretical soluti<strong>on</strong> 19 .<br />
- The IRIS FOC soluti<strong>on</strong> has a similar behaviour than the MEO/C-band, since its technical<br />
evaluati<strong>on</strong> is highly positive (<strong>on</strong>ly with a bad grade <strong>on</strong> the double-hop delay required in voice<br />
applicati<strong>on</strong>s). In additi<strong>on</strong>, this soluti<strong>on</strong> is currently planned, although from 2025.<br />
- Some <strong>of</strong> the other systems best positi<strong>on</strong>ed, the GEO/C-band soluti<strong>on</strong>, has main problems <strong>on</strong> the<br />
double-hop delay, handhelds and security but, <strong>on</strong> the other hand, its n<strong>on</strong>-technical evaluati<strong>on</strong> is<br />
largely positive.<br />
Criteri<strong>on</strong> ID<br />
1 2 3 4 5 6 7 8 9 10 11<br />
Iridium NEXT<br />
MEO / C-band<br />
Inmarsat 4 (BGAN)<br />
- Inmarsat 6 (ICE)<br />
Satcom technology<br />
IRIS FOC Thuraya GEO / S-band GEO / C-band GEO / X-band SmartLNB GEO / Ku-band<br />
Inmarsat 5<br />
(Global Xpress)<br />
CRT-TECH-1 NC C NC C (Low) NC C (Low) C (Low) NC NC NC NC<br />
CRT-TECH-2 C (Low) C (High) C (Low) C (High) C (Low) C (Low) C (High) C (High) C (High) C (High) C (High)<br />
CRT-TECH-3 C C C C C C C C C C C<br />
CRT-TECH-4a C (High) C (High) NC C (Low) C (Low) NC C (Low) C (Low) NC C (Low) C (Low)<br />
CRT-TECH-4b C (High) C (High) NC NC NC NC NC NC NC NC NC<br />
CRT-TECH-5 C (High) C (High) C (Low) C (Low) C (Low) C (Low) C (Low) C (Low) C (Low) C (Low) C (Low)<br />
CRT-TECH-6 C C NC C C C C C C C NC<br />
CRT-TECH-7 NC C NC C (High) NC C (High) C C C (High) C C<br />
CRT-TECH-8 NC C PC C NC C C C C C C<br />
CRT-TECH-9 C C C C C C C C C C C<br />
CRT-TECH-10 C C C C (Low) C PC C C PC C C<br />
CRT-TECH-11 C C C C (Low) C (Low) C (Low) C C C C (High) C (High)<br />
CRT-TECH-12 NC C NC C NC C C C C C NC<br />
CRT-TECH-13 C C C C C C C C C C C<br />
CRT-TECH-14 C C C C NC C C C PC C C<br />
CRT-TECH-15 C (Low) C (High) C C (Low) C (Low) C (Low) C (High) C (High) C (Low) C (High) C (High)<br />
CRT-TECH-16 C (Low) C (Low) C (Low) C (Low) NC C (Low) C (High) C C (High) C (High) C (Low)<br />
CRT-TECH-17 C (Low) C C (Low) PC C (Low) C PC PC PC PC PC<br />
CRT-TECH-18 C (Low) C (High) C (High) C (High) C (Low) C (High) C (High) C (High) C (High) C (High) C (High)<br />
CRT-TECH-19 NC NC C NC NC PC NC NC PC NC NC<br />
CRT-MULT-1 C (Low) C (High) C (Low) C C (Low) C C (High) C (High) C C (High) C (High)<br />
CRT-NONT-1 PC NC C NC PC PC C C C C PC<br />
CRT-NONT-2 C C C C C C C PC PC PC PC<br />
CRT-NONT-3 C NC C PC C C C C C C C<br />
CRT-NONT-4 C C C N/A N/A N/A C N/A C C N/A<br />
CRT-NONT-5 C C C N/A N/A N/A C N/A C C N/A<br />
CRT-NONT-6 PC C PC C PC PC PC PC PC PC PC<br />
CRT-NONT-7 C NC PC NC C C C C C C C<br />
Figure 91: Complete compliance matrix<br />
Figure 92 shows a comparis<strong>on</strong> am<strong>on</strong>g the different <strong>SATCOM</strong> soluti<strong>on</strong>s analysed. The graph shows a<br />
―total score‖ computed taking into account the complete compliance matrix <strong>of</strong> Figure 91 20 .<br />
19<br />
Despite the MEO/C-band is <strong>on</strong>ly a theoretical soluti<strong>on</strong>, a similar soluti<strong>on</strong> exists nowadays. It is a MEO/S-band (ICO), which is<br />
currently reaching its end <strong>of</strong> life.<br />
20<br />
Results have been calculated assigning a score <strong>of</strong> 1 point to PC and 2 points to compliant evaluati<strong>on</strong>s.<br />
Doc.Nº: SRAIL-FNR-010-IND<br />
Edit./Rev.: 1/1<br />
Date: 16/02/2017<br />
Page 173 <strong>of</strong> 285