Study on feasibility of SATCOM for railway communication
SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216
SRAIL-FNR-010-IND%20-%20FinalReport_v1.1_20170216
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Final Report<br />
Unknown<br />
The results from the assessment are uncertain<br />
Fully Compliant The technology holds a TRL superior to 7<br />
CRT-NONT-7<br />
Partially<br />
Compliant<br />
The technology holds a TRL6 and it is close to reaching TRL7<br />
Not Compliant The technology holds a TRL lower than 6<br />
Not Applicable<br />
Unknown<br />
This criteria has not been assessed<br />
The results from the assessment are uncertain<br />
General comments:<br />
Table 39: Horiz<strong>on</strong>tal assessment criteria <strong>of</strong> the n<strong>on</strong>-technical requirements<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
CRT-NONT-1 is an achievable criteri<strong>on</strong> with a wide range <strong>of</strong> complying soluti<strong>on</strong>s. It is also a<br />
useful criteri<strong>on</strong> as it discards the soluti<strong>on</strong>s that have not been developed yet and reduces the<br />
pool <strong>of</strong> plausible candidates.<br />
CRT-NONT-2 shows that there is still a gap <strong>for</strong> improvement regarding maintainability. The<br />
majority <strong>of</strong> <strong>SATCOM</strong> soluti<strong>on</strong>s require parabolic antennas introducing more vulnerability to the<br />
system and increasing maintenance requirements. This is even more relevant in broadband<br />
soluti<strong>on</strong>s.<br />
CRT-NONT-3 assesses whether or not the soluti<strong>on</strong>s proposed are efficient within the existing<br />
infrastructure. It is regarded that this criteri<strong>on</strong> is easily achievable by the majority <strong>of</strong> the<br />
soluti<strong>on</strong>s.<br />
CRT-NONT-4, as an ec<strong>on</strong>omic criteri<strong>on</strong>, is positive <strong>for</strong> all the candidates when compared to the<br />
GSM-R baseline. The soluti<strong>on</strong>s labelled N/A have not been assessed within the scope <strong>of</strong> the<br />
cost-benefit analysis.<br />
CRT-NONT-5 shows an equivalent result to CRT-NONT-4.<br />
CRT-NONT-6 shows that the majority <strong>of</strong> the candidates will require a slight modificati<strong>on</strong> in the<br />
design to comply with the certificati<strong>on</strong> standards imposed by the <strong>railway</strong> sector. However, it<br />
appears as an achievable target and it shows full compliance <strong>for</strong> the theoretical, n<strong>on</strong>-deployed<br />
soluti<strong>on</strong>s, which have been assumed to be designed from the ground up <strong>for</strong> <strong>railway</strong> use.<br />
CRT-NONT-7 shows the soluti<strong>on</strong>s proposed have sufficient technology readiness to operate<br />
the services, apart from MEO C-band and GEO L-band +Antares, which have not been<br />
developed yet and are c<strong>on</strong>sidered as potential soluti<strong>on</strong>s based <strong>on</strong> their technical features.<br />
Special attenti<strong>on</strong> will be paid to Iridium NEXT, which partially complies with CRT-NONT-1. This is due<br />
to the fact that the provider ensures its services until 2032, even though it is expected to keep working<br />
bey<strong>on</strong>d this date. It is also worth pointing out that future planned technologies such as GEO L-band +<br />
Antares CS (within the IRIS FOC) or even hypothetical soluti<strong>on</strong>s such as the MEO C-band, are<br />
assumed to comply fully with certificati<strong>on</strong> standard criteria. As pointed out be<strong>for</strong>e, this is due to the fact<br />
that in the case that those technologies were developed (or adopted) <strong>for</strong> the <strong>railway</strong> purpose, those<br />
technologies would incorporate the certificati<strong>on</strong> standards compliance as a requirement in the design.<br />
Doc.Nº: SRAIL-FNR-010-IND<br />
Edit./Rev.: 1/1<br />
Date: 16/02/2017<br />
Page 164 <strong>of</strong> 285