06.02.2013 Views

FINAL REPORT - Stakeholders - Ofcom

FINAL REPORT - Stakeholders - Ofcom

FINAL REPORT - Stakeholders - Ofcom

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

VHF air-ground Digital Link (VDL) Mode 2; Technical characteristics and methods of<br />

measurement for ground-based equipment; Part 1: Physical layer, EN 301 841-1<br />

(published), Part 2: Data link layer, EN 301 841-2 (draft), ETSI, 2002.<br />

LINK 2000+ Programme Master Plan, Version 0.94.<br />

Euro VDL Mode 2 – Project Overview, Version 2.0.<br />

631-3 VHF Digital Link Implementation Provisions Functional Description, October 2000,<br />

ARINC.<br />

EUROCONTROL VDL-2 day presentations, 18th April 2001.<br />

VDL-2 Physical layer validation report, EUROCONTROL COM -5-11-0501.<br />

PETAL-II Transition and Final Report, Volume 1, EUROCONTROL, May 2002.<br />

PETAL-II Transition and Final Report, Volume 2, EUROCONTROL, May 2002.<br />

VDL Mode 3<br />

Standards and Recommended Practices (SARPs) for VHF Digital Link, Annex 10, Volume<br />

III, Part I, ICAO.<br />

Technical Manual – AMCP/7-WP81 Appendix B to the report on Agenda Item 1.<br />

Implementation Manual – AMCP/7-WP81 Appendix C to the report on Agenda Item 1.<br />

DO-271, Minimum Operational Performance Standards (MOPS) for Aircraft VDL Mode 3<br />

Transceiver Operating in the Frequency range 117.975-137.000 MHz, RTCA.<br />

DO-224A, Signal-in-Space Minimum Aviation System Performance Standards (MASPS) for<br />

Advanced VHF Digital Data Communications Including Compatibility with Digital Voice<br />

Techniques, RTCA.<br />

GAO-02-710 National Airspace System, FAA’s approach to its New Communication<br />

system appears prudent, but challenges remain, FAA, July 2002.<br />

NEXCOM System Requirements Document, FAA-E-2958, FAA, January 2002.<br />

NEXCOM Multimode Digital Radio, FAA-E-2938, FAA, July 2001<br />

NEXCOM Next Generation Air/Ground Communications, Jim Eck, FAA, October 2001.<br />

NEXCOM Avionics Approach, Sandra Anderson, FAA, October 2001.<br />

Why VDL-3? The rationale behind the FAA’s technology choice for NEXCOM, FAA,<br />

September 2001.<br />

DO-279, Next Generation Air/Ground Communications (NEXCOM) Principles of operation<br />

for VDL Mode 3, RTCA<br />

VDL Mode 4<br />

Draft Manual on Detailed Specifications for the VDL Mode 4 Digital Link (EUROCONTROL<br />

working draft post AMCP WG-M/2), EUROCONTROL (ICAO), 21 January 2002.<br />

Standards and Recommended Practices (SARPs) for VHF Digital Link, Annex 10, Volume<br />

III, Part I, ICAO.<br />

ED-108: Interim MOPS for VDL Mode 4 Aircraft Transceiver for ADS-B EUROCAE, July<br />

2001.<br />

Technical Link Assessment Report, EUROCONTROL, March 2001.<br />

Page 340

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!