27.04.2013 Views

RingMaster Management Guide - Juniper Networks

RingMaster Management Guide - Juniper Networks

RingMaster Management Guide - Juniper Networks

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. To generate a new report, click the Generate item from the Tasks panel to display the<br />

Generate Report > Rogue Summary Report dialog.<br />

5. Select the scope type of the report from the Report Scope Type list:<br />

❑ Mobility Domain<br />

❑ Site<br />

❑ Building<br />

❑ Floor<br />

6. Select the instance for which you want the report. For example, if the scope is Building, select<br />

the building.<br />

7. Select the time period for the report:<br />

❑ 1 Hour<br />

❑ 24 Hours<br />

❑ 7 Days<br />

❑ 30 Days<br />

8. To specify the rogue type, click on the Value field in the Report Filter area of the dialog, and<br />

select one of the following from the list:<br />

❑ Rogue<br />

❑ Interfering<br />

❑ Ad-hoc<br />

❑ All (This option displays all three types: rogue, interfering, and ad-hoc.)<br />

The default is Rogue.<br />

9. Click Next to generate the report.<br />

190 <strong>RingMaster</strong> Reports Copyright © 2011, <strong>Juniper</strong> <strong>Networks</strong>, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!