03.05.2013 Views

OVERVIEW OF THE IMPACT OF MINING ON THE ... - IIED pubs

OVERVIEW OF THE IMPACT OF MINING ON THE ... - IIED pubs

OVERVIEW OF THE IMPACT OF MINING ON THE ... - IIED pubs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

siting of works plan for approval to the mining commissioner. This plan should also show rivers, hills and other<br />

natural features. Section 236 allows for the lodging of objections within 21 days of their notification by the<br />

mining commissioner. It should be noted that the miner may carry out certain works before the plan is<br />

submitted. These works can include residential accommodation, roads and dumps.<br />

There are several other sections within the Act that could be construed as rehabilitation regulations, but these<br />

were largely developed with safety in mind (Table 2.7).<br />

Table 2.7: Sections of the Mines And Minerals Act (1996) relevant to environmental protection in Zimbabwe.<br />

Section Comment<br />

267 The miner may remove buildings and machinery from an abandoned, forfeited or<br />

cancelled mining location.<br />

269 The miner is required to fill in all shafts, open surface workings and excavations or<br />

to deal with them otherwise to ensure the safety of people and livestock. This<br />

should be done within 30 days of abandonment.<br />

311 Timber on “Town Lands” cannot be cut without permission of the Mining<br />

Commissioner.<br />

312 Water from mining operations on “Town Lands” shall not pollute surface water with<br />

mine water – but it must be disposed of in the nearest natural water channel.<br />

370 Prospectors are required to fence or enclose the mouths of all shafts and other<br />

open surface workings for the protection of people and livestock. He should<br />

maintain these during the period that prospecting is continuing.<br />

403 The minister can make regulations as deemed expedient regarding safety,<br />

sanitation, housing and feeding of employees, welfare etc; amongst other<br />

administrative matters.<br />

The Act also recognises the powers of the Water Court, especially if it affects public water or irrigation projects.<br />

2.9.2.2 Mining (Alluvial Gold) (Public Streams) Regulations, 1991 (SI 275/1991)<br />

This statutory Instrument contains some environmental safeguards and is aimed at controlling the activities of<br />

small scale panning locations. These include the distance of workings from the stream bank (3 metres), the<br />

depth of unsupported workings (1.5 metres) and the use of machinery - which must be authorised by an<br />

inspector of mines in consultation with the provincial natural resources officer.<br />

lxix

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!