02.07.2013 Views

point cover jan 13 - Boston Redevelopment Authority

point cover jan 13 - Boston Redevelopment Authority

point cover jan 13 - Boston Redevelopment Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Vanasse Hangen Brustlin, Inc.<br />

The Point, <strong>Boston</strong><br />

*Note: All figures are located at the end of each chapter.<br />

Figure No. Description<br />

S.1 Site Location Map<br />

S.2 Project Area Context<br />

S.3 Existing Conditions Site Plan<br />

S.4 Existing Site Photographs<br />

S.5a Proposed Ground Floor Plan<br />

S.5b Proposed Level 2 Floor Plan<br />

S.5c Proposed Levels 3-4 Typical Residential Floor Plan<br />

S.5d Proposed Levels 5-9 Typical Residential Floor Plan<br />

S.5e Proposed Levels 10-12 Typical Residential Floor Plan<br />

S.5f Proposed Levels <strong>13</strong>-22 Typical Residential Floor Plan<br />

S.5g Proposed Level 23 Floor Plan<br />

S.6 Project Rendering<br />

2.1 Building Development Plan<br />

2.2a West Building Elevation<br />

2.2b East Building Elevation<br />

2.2c South Building Elevation<br />

2.2d North Building Elevation<br />

2.3a North-South Section Looking East<br />

2.3b East-West Section Looking North<br />

2.4 Plan and Massing Diagrams<br />

3.1 Proposed Site Access and Circulation<br />

3.2 Traffic Study Area<br />

3.3 2012 Existing Conditions AM Peak Traffic Volumes<br />

3.4 2012 Existing Conditions PM Peak Traffic Volumes<br />

3.5 2012 Existing Conditions AM Peak Pedestrian Volumes<br />

3.6 2012 Existing Conditions PM Peak Pedestrian Volumes<br />

3.7 Existing Public Transportation<br />

3.8 2012 Existing Conditions AM Peak Bicycle Volumes<br />

3.9 2012 Existing Conditions PM Peak Bicycle Volumes<br />

3.10 Summary of Nearby On-Street Parking Regulations<br />

3.11 2017 No-Build Conditions AM Peak Traffic Volumes<br />

3.12 2017 No-Build Conditions PM Peak Traffic Volumes<br />

\\MABOS\projects\1<strong>13</strong>81.00\reports\Article80\<br />

Expanded_PNF\00c_TOC_FINAL.doc vi Table of Contents<br />

List of Figures

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!