The Point, <strong>Boston</strong><br />

designed, constructed, and managed to minimize adverse environmental impacts; to conserve natural<br />

resources; to promote sustainable development; and to enhance the quality of life in <strong>Boston</strong>.” Any project that<br />

is subject to Article 80 Large Project Review is also subject to the requirements of Article 37.<br />

An interdisciplinary committee, the “<strong>Boston</strong> Interagency Green Building Committee,” consisting of at least<br />

one representative of city agencies, including the BRA, BED, BTD, the Inspectional Services Department and<br />

the Mayor’s Office advises the BRA on a proposed project’s compliance with the provisions of the article.<br />

<strong>Boston</strong> Green Building Credits<br />

Appendix A of Article 37 lists “<strong>Boston</strong> Green Building Credits,” which are credits that may be included in the<br />

calculation toward achieving a LEED Certifiable project. These credits were developed by the City and are<br />

intended to address local issues unique to development within <strong>Boston</strong>. The credits include the following<br />

categories: Modern Grid; Historic Preservation; Groundwater Recharge; and Modern Mobility.<br />

At this preliminary design stage, the Project will evaluate achieving two of the four available <strong>Boston</strong> Green<br />

Building credits (Appendix A of Article 37):<br />

Groundwater Recharge. The Project is located within the GCOD, as defined in Article 32 of the City of<br />

<strong>Boston</strong> Zoning Code. <strong>13</strong> The Project will include and infiltration system that holds one-inch of site runoff<br />

and utilizes a leaching bed to infiltrate captured stormwater flows. Refer to Chapter 5, Infrastructure<br />

Systems for further details.<br />

Modern Mobility. Because the Project Site is in close proximity to both rapid transit and bus service<br />

strategies are proposed in order to take advantage of available transportation access. The Proponent will<br />

implement such measures, through the development of a TDM Plan. One example of a proposed TDM<br />

measure is property management to coordinate and post public transportation information (i.e., MBTA<br />

subway and bus routes and schedules). Refer to Chapter 3, Transportation for further detail on the<br />

proposed TDM Plan. No new parking will be constructed as part of the Project. The Project will be<br />

connected to the existing Trilogy Garage, which currently houses four ZipCar® cars. The Proponent will<br />

review this existing service, which will be available to the residents of the Project, and evaluate if demand<br />

warrants coordination of additional car-share service capacity. Additionally, the Proponent will work<br />

with BTD to provide appropriate bicycle facilities, including on-site secure bike storage (potentially in the<br />

form of bike racks for retail customers and employees, and <strong>cover</strong>ed and secure bike lockers for residents).<br />

Sustainable Sites (SS)<br />

Construction Activity (SS Prerequisite 1). This prerequisite is achievable. An erosion and sedimentation<br />

control plan for all construction activities will be developed and enforced.<br />

Site Selection (SS Credit 1). This credit is achievable. The Project Site has previously been completely<br />

developed, is located in an urban area and, meets all of the criteria for this credit.<br />

<br />

<strong>13</strong> This zoning article sets forth guidelines for promoting the infiltration of runoff from impervious site areas<br />

within the district.<br />

4-40 Environmental Protection