02.07.2013 Views

point cover jan 13 - Boston Redevelopment Authority

point cover jan 13 - Boston Redevelopment Authority

point cover jan 13 - Boston Redevelopment Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Vanasse Hangen Brustlin, Inc.<br />

The Point, <strong>Boston</strong><br />

Anticipated State and Local Permits and Other Approvals<br />

Table 1-1 lists the anticipated permits and approvals from state, and local governmental agencies, which are<br />

presently expected to be required for the Project, based on information currently available. It is possible that not all<br />

of these permits or actions will be required, or that additional permits or actions may be needed.<br />

Table 1-1<br />

List of Anticipated Permits and Approvals<br />

Agency/Department Permit/Approval/Action<br />

Commonwealth of Massachusetts1 Department of Conservation and Recreation (DCR) Design Review<br />

Construction and Access Permit<br />

MA Department of Environmental Protection (DEP), Division of Compliance Certification for Sewer Extensions for Sanitary &<br />

Water Pollution Control<br />

Industrial Connections 15,000-50,000gpd<br />

MA DEP, Division of Air Quality Control Fossil Fuel Utilization Permit - Self Certification<br />

Notice of Asbestos Removal<br />

Notice of Commencement of Demolition and Construction<br />

Temporary Construction Dewatering Permit<br />

Executive Office of Energy and Environmental Affairs (EEA) Review of an Environmental Notification Form (ENF) under the<br />

Massachusetts Environmental Policy Act (MEPA).<br />

Massachusetts Historical Commission (MHC) Review of a Project Notification Form (PNF). To be submitted<br />

in February 20<strong>13</strong>.<br />

City of <strong>Boston</strong><br />

<strong>Boston</strong> <strong>Redevelopment</strong> <strong>Authority</strong> (BRA) Article 80 Large Project Review; Recommendation of Trilogy<br />

PDA and Map Amendment Approval; Recommendation of<br />

Text Amendment Approval; Cooperation Agreement;<br />

Affordable Housing Agreement; other applicable Article 80<br />

agreements<br />

<strong>Boston</strong> Zoning Commission Approval of Trilogy PDA Text Amendment and Map<br />

Amendment, including GCOD compliance approval<br />

<strong>Boston</strong> Civic Design Commission (BCDC) Schematic Design Review<br />

<strong>Boston</strong> Landmarks Commission Article 85 Demolition Delay (Determination of No Significance)<br />

<strong>Boston</strong> Parks and Recreation Department Approval of Demolition and Construction within 100 feet of<br />

Park or Parkway<br />

<strong>Boston</strong> Transportation Department (BTD) Transportation Access Plan Agreement; Construction<br />

Management Plan<br />

<strong>Boston</strong> Department of Public Works Street Opening Permit; Street/ Sidewalk Occupancy Permit<br />

Public Improvement Commission Specific Repair Approval for Sidewalk and Curb<br />

Improvements; Maintenance Agreement; Permit for Sign,<br />

Awning, Canopy<br />

<strong>Boston</strong> Water and Sewer Commission (BWSC) Local Sewer and Water Tie-in and Site Plan Approval<br />

<strong>Boston</strong> Fire Department Flammable Storage Permit<br />

<strong>Boston</strong> Department of Inspectional Services Building Permits; Other Construction-Related Permits; Site<br />

Cleanliness Permit; Certificates of Occupancy<br />

GCOD Groundwater Conservation Overlay District<br />

PDA Planned Development Area<br />

\\MABOS\projects\1<strong>13</strong>81.00\reports\Article80\Expand<br />

ed_PNF\01_GenInfo_RegContext_FINAL.doc 1-4 General Information and Regulatory Context

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!