point cover jan 13 - Boston Redevelopment Authority
point cover jan 13 - Boston Redevelopment Authority
point cover jan 13 - Boston Redevelopment Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Vanasse Hangen Brustlin, Inc.<br />
The Point, <strong>Boston</strong><br />
Anticipated State and Local Permits and Other Approvals<br />
Table 1-1 lists the anticipated permits and approvals from state, and local governmental agencies, which are<br />
presently expected to be required for the Project, based on information currently available. It is possible that not all<br />
of these permits or actions will be required, or that additional permits or actions may be needed.<br />
Table 1-1<br />
List of Anticipated Permits and Approvals<br />
Agency/Department Permit/Approval/Action<br />
Commonwealth of Massachusetts1 Department of Conservation and Recreation (DCR) Design Review<br />
Construction and Access Permit<br />
MA Department of Environmental Protection (DEP), Division of Compliance Certification for Sewer Extensions for Sanitary &<br />
Water Pollution Control<br />
Industrial Connections 15,000-50,000gpd<br />
MA DEP, Division of Air Quality Control Fossil Fuel Utilization Permit - Self Certification<br />
Notice of Asbestos Removal<br />
Notice of Commencement of Demolition and Construction<br />
Temporary Construction Dewatering Permit<br />
Executive Office of Energy and Environmental Affairs (EEA) Review of an Environmental Notification Form (ENF) under the<br />
Massachusetts Environmental Policy Act (MEPA).<br />
Massachusetts Historical Commission (MHC) Review of a Project Notification Form (PNF). To be submitted<br />
in February 20<strong>13</strong>.<br />
City of <strong>Boston</strong><br />
<strong>Boston</strong> <strong>Redevelopment</strong> <strong>Authority</strong> (BRA) Article 80 Large Project Review; Recommendation of Trilogy<br />
PDA and Map Amendment Approval; Recommendation of<br />
Text Amendment Approval; Cooperation Agreement;<br />
Affordable Housing Agreement; other applicable Article 80<br />
agreements<br />
<strong>Boston</strong> Zoning Commission Approval of Trilogy PDA Text Amendment and Map<br />
Amendment, including GCOD compliance approval<br />
<strong>Boston</strong> Civic Design Commission (BCDC) Schematic Design Review<br />
<strong>Boston</strong> Landmarks Commission Article 85 Demolition Delay (Determination of No Significance)<br />
<strong>Boston</strong> Parks and Recreation Department Approval of Demolition and Construction within 100 feet of<br />
Park or Parkway<br />
<strong>Boston</strong> Transportation Department (BTD) Transportation Access Plan Agreement; Construction<br />
Management Plan<br />
<strong>Boston</strong> Department of Public Works Street Opening Permit; Street/ Sidewalk Occupancy Permit<br />
Public Improvement Commission Specific Repair Approval for Sidewalk and Curb<br />
Improvements; Maintenance Agreement; Permit for Sign,<br />
Awning, Canopy<br />
<strong>Boston</strong> Water and Sewer Commission (BWSC) Local Sewer and Water Tie-in and Site Plan Approval<br />
<strong>Boston</strong> Fire Department Flammable Storage Permit<br />
<strong>Boston</strong> Department of Inspectional Services Building Permits; Other Construction-Related Permits; Site<br />
Cleanliness Permit; Certificates of Occupancy<br />
GCOD Groundwater Conservation Overlay District<br />
PDA Planned Development Area<br />
\\MABOS\projects\1<strong>13</strong>81.00\reports\Article80\Expand<br />
ed_PNF\01_GenInfo_RegContext_FINAL.doc 1-4 General Information and Regulatory Context