Analysis Conditions<br />

\\MABOS\projects\1<strong>13</strong>81.00\reports\Article80\<br />

Expanded_PNF\04_Environmental_FINAL.do<br />

c<br />

Vanasse Hangen Brustlin, Inc.<br />

The Point, <strong>Boston</strong><br />

This expanded PNF compares the future no-build and build year conditions in order to identify the potential<br />

for the Project to impact the resources listed above. Where applicable, the existing conditions are considered<br />

for comparison. In order to compare the effects of the proposed development, the following analysis<br />

conditions were identified:<br />

2012 Existing Condition represents the baseline analysis conditions for comparison to future conditions.<br />

2017 No-Build Condition represents the anticipated development conditions based on known<br />

planned/approved development projects scheduled to be completed within five years without the<br />

Project.<br />

2017 Build Condition represents the 2017 No-Build Conditions with the anticipated development<br />

conditions as a result of the Project.<br />

Pedestrian Wind<br />

Pedestrian level winds conditions were evaluated as a part of this expanded PNF document, as required by<br />

Section 80-B3 of the <strong>Boston</strong> Zoning Code. The objective of the wind study was to assess the potential effect of<br />

the Project on local wind conditions in pedestrian areas around the Project Site and provide<br />

recommendations for minimizing unacceptable effects, if any.<br />

<br />

Summary of Key Findings<br />

The Project has been designed to minimize or, where possible, eliminate negative effects on the pedestrian<br />

wind environment, as it incorporates mitigating elements into its design. Due to wind exposure and the<br />

constrained size and shape of the Project Site, eliminating Project-related wind impacts has proven to be<br />

particularly challenging. Over 20 iterations of wind tunnel mitigation testing was conducted in an effort to<br />

improve upon local wind conditions. Based on these tests it has been determined that the construction of any<br />

building taller than the existing single-story building at the Project Site will be exposed to the uninterrupted<br />

prevailing winds from the northwest compass quadrant. A large number of mitigation options were<br />

considered and analyzed, and the ones that achieve the best results are proposed and compared against the<br />

baseline conditions. Given the challenge with winds at the Project Site, significant consideration was given to<br />

the building design with regard to minimizing wind effects in the vicinity. The currently proposed<br />

configuration almost completely addresses unacceptable wind conditions. The final design of the project will<br />

include additional refinements such as landscaping, awnings, and wind screens to adjust conditions for<br />

specific ground level uses.<br />

4-2 Environmental Protection