London Wider Waste Strategy - London - Greater London Authority
London Wider Waste Strategy - London - Greater London Authority
London Wider Waste Strategy - London - Greater London Authority
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
C&D waste.<br />
• requiring the use of the <strong>London</strong> Sustainable<br />
Construction Code and Demolition Protocol<br />
prior to giving developers permission to<br />
proceed with a demolition and construction<br />
project.<br />
7 Develop and publish a best practice guide for the<br />
management of waste resulting from large-scale public<br />
events.<br />
8 Subject to the views of NetRegs, carry out a more detailed<br />
survey of waste management practice of commercial SMEs<br />
in <strong>London</strong> (to augment the results of the SME-nvironment<br />
survey 2003)<br />
9 The feasibility of establishing medium/large scale biogas<br />
facilities for the processing of <strong>London</strong>’s organic waste<br />
should be investigated, including the feasibility of using<br />
the biogas and heat from such facilities in co-located<br />
industrial sites.<br />
Medium GLA, ALG<br />
Medium GLA, Envirowise,<br />
EA<br />
Medium GLA, <strong>London</strong><br />
ReMade, EA,<br />
DEFRA<br />
1 Key to priorities (used in conjunction with the Mayor’s Municipal <strong>Waste</strong> <strong>Strategy</strong>):<br />
Key – requires immediate attention<br />
Short – requires attention in the short term (6 to 12 months)<br />
Medium – requires attention in the medium term (12 to 24 months)<br />
141