London Wider Waste Strategy - London - Greater London Authority
London Wider Waste Strategy - London - Greater London Authority
London Wider Waste Strategy - London - Greater London Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table E15: What is the situation regarding an environmental management<br />
system (EMS) in your <strong>Authority</strong>?<br />
WCA UA WDA Total<br />
Operating an ISO 14001 certified EMS - - - -<br />
Operating an EMAS certified EMS - 1 - 1<br />
Developing an EMS with the intention<br />
of certifying against ISO 14001<br />
Developing an EMS with the intention<br />
of certifying against EMAS<br />
Operating an uncertified EMS – no plans<br />
to certify against a recognised standard<br />
No EMS, but planning to develop one in<br />
the future<br />
1 1 - 1 2<br />
- - - -<br />
1 - - 1<br />
3 1 - 4<br />
No EMS and no plans to develop one 4 4 - 8<br />
Other (please specify) - - - -<br />
Total 9 6 1 16<br />
Notes:<br />
Six authorities (two WCAs, one UA and three WDAs) did not answer this question.<br />
1. The respondent indiciated that the EMS was being developed by the contractor.<br />
All the authorities were asked about whether they had or were intending to develop a quality<br />
management system (QMS). From the following table it can be seen that 10 of the 16<br />
respondents had or intended to develop a QMS, whilst 6 do not plan to do so. Seven have<br />
some form of system in place at present, three of which is certified to ISO 9002. Seven<br />
authorities did not answer this question.<br />
Table E16: What is the situation regarding a quality management system<br />
(QMS) in your <strong>Authority</strong>?<br />
WCA UA WDA Total<br />
Operating an ISO 9002 certified QMS 2 1 - 3<br />
Developing a QMS with the intention of<br />
certifying against ISO 9002<br />
Operating an uncertified QMS – no<br />
plans to certify against a recognised<br />
standard<br />
No QMS, but planning to develop one in<br />
the future<br />
1 1 1 1 3<br />
- - - -<br />
3 - - 3<br />
No QMS and no plans to develop one 1 5 - 6<br />
Other (please specify) 1 2 - - 1<br />
Total 8 7 1 16<br />
Notes:<br />
177