negligence <strong>of</strong> the Contractor. The foregoing obligations <strong>of</strong> the Contractor are in addition to its obligations stated<br />
elsewhere herein.<br />
12.2.8 Asbestos – For work involving existing facilities, structures, or buildings, the Collage has performed<br />
campus wide tests for asbestos. The <strong>College</strong> has performed removal <strong>of</strong> asbestos materials in identified areas and to the<br />
best <strong>of</strong> the <strong>College</strong>’s knowledge there are no such hazardous materials in the existing scope <strong>of</strong> the project. Should the<br />
Contractor encounter materials suspected as asbestos or polychlorinated biphenyl (PCB), the Contractor shall<br />
immediately suspend work in that location and notify the Contracting Officer, The Architect/Engineer, and the<br />
Construction Manager.<br />
12.3 Emergencies<br />
12.3.1 In any emergency affecting the safety <strong>of</strong> persons or property, the Contractor shall act with diligence,<br />
at its discretion, to prevent threatening injury, damage or loss. In such case, he shall immediately notify the Contracting<br />
Officer, through the Construction Manager, <strong>of</strong> the action taken.<br />
RCNJ <strong>Project</strong> No.: 09-270.1C - 50 -