07.06.2014 Views

Project Manual 11-210C - Ramapo College of New Jersey

Project Manual 11-210C - Ramapo College of New Jersey

Project Manual 11-210C - Ramapo College of New Jersey

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Ramapo</strong> <strong>College</strong> <strong>of</strong> <strong>New</strong> <strong>Jersey</strong><br />

E-Wing Renovation for Teacher’s Education<br />

General Conditions<br />

Table <strong>of</strong> Contents<br />

Article 1 Contract Documents Pages 4-7<br />

1.1 Definitions<br />

1.2 Intent <strong>of</strong> the Contract<br />

Article 2 Contracting Officer Pages 8-10<br />

2.1 Contracting Officer’s Right to Stop Work<br />

2.2 Contracting Officer’s Right to Carry Out the Work<br />

2.3 Contracting Officer’s Right to Terminate<br />

2.4 Review <strong>of</strong> Contractor Claims and Disputes<br />

2.5 <strong>College</strong> Representation<br />

2.6 Ownership and Use <strong>of</strong> Documents<br />

Article 3 Construction Manager and Architect/Engineer Pages <strong>11</strong>-12<br />

3.1 Construction Manager and Architect/Engineer<br />

3.2 Administration <strong>of</strong> the Contract<br />

3.3 Substantial and Final Completion Inspections<br />

Article 4 The Contractor Pages 13-27<br />

4.1 Review <strong>of</strong> Contract<br />

4.2 <strong>New</strong> <strong>Jersey</strong> Prevailing Wage Act<br />

4.3 Supervision and Construction Procedures<br />

4.4 Responsibility for the Work<br />

4.5 Permits-Laws-Regulations<br />

4.6 Storage, Cleaning and Final Cleanup<br />

4.7 Interruptions to Existing Services<br />

4.8 Non-Regular Working Hours and Workdays<br />

4.9 Record Documents<br />

4.10 Shop Drawings, Product Data, Samples, and Coordination Drawings<br />

4.<strong>11</strong> Miscellaneous Drawings and Charts<br />

4.12 Cutting and Patching<br />

4.13 Tests and Inspections<br />

4.14 Equipment-Material<br />

4.15 Substitutions<br />

4.16 Soil Borings<br />

4.17 Protection <strong>of</strong> Contractor’s Property<br />

4.18 Patents<br />

4.19 Right to Audit<br />

4.20 Photographs<br />

4.21 Guarantee<br />

4.22 Indemnification<br />

4.23 Contractor’s Claims for Damages<br />

4.24 Layout, Dimensional Control and Verification, Surveyor’s Certification<br />

4.25 Inspection <strong>of</strong> Roadway Subgrades<br />

RCNJ <strong>Project</strong> No. <strong>11</strong>-<strong>210C</strong> - 1 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!