07.06.2014 Views

Project Manual 11-210C - Ramapo College of New Jersey

Project Manual 11-210C - Ramapo College of New Jersey

Project Manual 11-210C - Ramapo College of New Jersey

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

every aspect <strong>of</strong> ongoing construction. The <strong>College</strong>'s representatives, including the Construction Manager and its staff,<br />

have only those duties which are required <strong>of</strong> an <strong>College</strong>; responsibility for completion <strong>of</strong> this project, pursuant to the<br />

Contract Documents, remains with the Contractor.<br />

2.6 Ownership and Use <strong>of</strong> Documents<br />

2.6.1 All Drawings, Specifications and copies there<strong>of</strong> furnished by the Architect/Engineer are and shall<br />

remain the property <strong>of</strong> the <strong>College</strong>. They are reserved to this <strong>Project</strong> only and are not to be used on any other <strong>Project</strong>.<br />

Submission or distribution <strong>of</strong> Documents to meet <strong>of</strong>ficial regulatory requirements, or for any other purposes in<br />

connection with the <strong>Project</strong> shall not be construed as derogation <strong>of</strong> the Architect/Engineer's copyright or other reserved<br />

rights.<br />

RCNJ <strong>Project</strong> No.: 09-270.1C - 10 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!