equirements and the Plans and Specifications <strong>of</strong> the Work. Such actions shall be taken with reasonable promptness.<br />

Approval <strong>of</strong> a specific item shall not indicate approval <strong>of</strong> an assembly <strong>of</strong> which the item is a component.<br />

3.2.6 Both the Architect/Engineer and the Construction Manager will periodically review the Contractor's<br />

as built drawings to insure that these are current.<br />

3.3 Substantial and Final Completion Inspections<br />

3.3.1 The Construction Manager and the Architect/Engineer will conduct inspections, accompanied by the<br />

Contractor and Contracting Officer's authorized representatives, to determine the dates <strong>of</strong> Substantial and Final<br />

Completion, will receive and forward to the Contracting Officer for its review, written warranties and related documents<br />

required by the Contract Documents and assembled by the Contractor, and will approve the issuance <strong>of</strong> a Certificate <strong>of</strong><br />

Final Completion.<br />