eviewed by the Architect/Engineer unless they contain such a stamp containing the words “Reviewed and<br />

Approved” accompanied by the Contractor’s signature and date.<br />

4.10.13 The Architect’s review is for conformance with the Design Concept and Contract Documents.<br />

Markings or comments shall not be construed as relieving the Contractor from compliance with the Contract<br />

Documents. No departures there from, are to be considered as authorizing extra work. The Contractor remains<br />

responsible for materials, dimensions, details and accuracy for confirming and correlating all quantities and<br />

dimensions, for selecting fabrication process for techniques <strong>of</strong> assembly, for performing this work in a safe manner,<br />

and <strong>of</strong> coordinating this work with that <strong>of</strong> all other trades.<br />

4.10.14 The Contractor will have only two (2) opportunities to receive approval <strong>of</strong> any submittal without<br />

consequence. If an approval is not received by the 2 nd submission due to the Contractor’s failure to adhere to the<br />

contract documents and/or Architect’s/Engineer’s review comments, the Contractor will be responsible for costs<br />

incurred by The <strong>College</strong> to review each submission thereafter until an approval is received.<br />

4.10.15 Schedule delays that may result from the rejection <strong>of</strong> submittals for non-conformance to the<br />

contract documents are the responsibility <strong>of</strong> the Contractor to recover.<br />

4.10.16 The Contractor shall prepare and submit coordination Drawings based on appropriate information<br />

from each subcontractor, where close and careful coordination is required for installation <strong>of</strong> products and materials<br />

fabricated <strong>of</strong>f-site by separate entities, and where limited space availability necessitates maximum utilization <strong>of</strong><br />

space for efficient installation <strong>of</strong> different components.<br />

4.10.17 The Contractor is responsible to fully coordinate all areas <strong>of</strong> work with others. This coordination<br />

is to be formalized in a set <strong>of</strong> coordination drawings signed <strong>of</strong>f by all necessary trades and submitted to the<br />

Architect. This process is to define areas <strong>of</strong> conflict which can be resolved prior to the start <strong>of</strong> material / equipment<br />

fabrication. The conflicts are to be brought to the Architect’s immediate attention in writing for resolution. Should a<br />

conflict arise after review and resolution <strong>of</strong> these conflicts, the Contractor will bear all costs necessary to resolve<br />

further discovered conflicts once work has commenced.<br />

4.<strong>11</strong> Miscellaneous Drawings and Charts<br />

4.<strong>11</strong>.1 Prior to installing service utilities or other piping, etc. through structural elements <strong>of</strong> the building,<br />

the Contractor shall prepare and submit, for approval <strong>of</strong> the Architect, accurate dimensioned Drawings indicating the<br />

positions and sizes <strong>of</strong> all sleeves and openings required to accommodate its work and installation <strong>of</strong> its piping,<br />

equipment, etc. and all with reference to the established dimensional grid <strong>of</strong> the Building. Such Drawings must be<br />

submitted in sufficient time to allow proper coordination with reinforcing steel Shop Drawings, openings in precast<br />

concrete members, and proper placing in the Field.<br />

4.<strong>11</strong>.2 The Contractor shall prepare a complete set <strong>of</strong> typewritten control valve and circuit location diagrams,<br />

charts, diagrams and lists under frame glass in appropriate designated equipment rooms, as directed. The Contractor<br />

shall also furnish one-line diagrams, as well as such color coding <strong>of</strong> piping and wiring and identifying charges as<br />

specified or required. This information to be framed under glass and installed where directed.<br />

4.12 Cutting and Patching<br />

4.12.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work<br />

or to make its parts fit together properly. All areas requiring cutting, fitting and patching shall be restored to the<br />

condition existing prior to the cutting, fitting and patching, unless otherwise required by the Contract Documents.<br />

4.12.2 Except as otherwise provided, Contractor shall do all cutting, drilling, removal, cleaning,<br />

servicing, repairing, rero<strong>of</strong>ing, patching, re-hanging, and restoration that may be required in connection with the<br />

work. Contractor shall pay for the restoration <strong>of</strong> existing conditions and work <strong>of</strong> others damaged by his actions.<br />

Contractor shall be responsible for maintaining all existing warranties.<br />