07.06.2014 Views

Project Manual 11-210C - Ramapo College of New Jersey

Project Manual 11-210C - Ramapo College of New Jersey

Project Manual 11-210C - Ramapo College of New Jersey

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION 01 40 00 – QUALITY REQUIREMENTS<br />

1.9 REPLACEMENT OF WORK<br />

A. Within 24 hours after rejection <strong>of</strong> work pursuant to the General Conditions, remove all materials and<br />

equipment so rejected and immediately replace work, at the Contractor's cost, to the satisfaction <strong>of</strong> the<br />

Architect and Construction Manager. Should the work <strong>of</strong> the Owner or other Contractors be damaged<br />

by such removal or replacement, the Contractor shall reimburse the Owner or other Contractors for all<br />

costs incurred for correcting damage.<br />

- END OF SECTION 01 40 00 -<br />

<strong>Ramapo</strong> <strong>College</strong> <strong>of</strong> <strong>New</strong> <strong>Jersey</strong><br />

01 40 00 QUALITY REQUIREMENTS<br />

E-Wing Renovation for Teacher’s Education Page 5 <strong>of</strong> 5<br />

RCNJ <strong>Project</strong> No. <strong>11</strong>-<strong>210C</strong><br />

Prepared by:<br />

Cambridge Construction Management

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!