07.06.2014 Views

Project Manual 11-210C - Ramapo College of New Jersey

Project Manual 11-210C - Ramapo College of New Jersey

Project Manual 11-210C - Ramapo College of New Jersey

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 01 70 00 – CLOSEOUT<br />

temporary heat and cooling for interior finish operations. Regardless <strong>of</strong> when equipment is activated for<br />

use during construction, all equipment warranties must extend for the time periods required in these<br />

Specifications starting as <strong>of</strong> Substantial Completion <strong>of</strong> the <strong>Project</strong>. The Contractor shall include in its<br />

base bid all costs necessary to provide extended warranties as necessary for any equipment which may<br />

be activated prior to Substantial Completion.<br />

- END OF SECTION 01 70 00 –<br />

<strong>Ramapo</strong> <strong>College</strong> <strong>of</strong> <strong>New</strong> <strong>Jersey</strong><br />

01 70 00 CLOSEOUT<br />

E-Wing Renovation for Teacher’s Education Page 5 <strong>of</strong> 6<br />

RCNJ <strong>Project</strong> No. <strong>11</strong>-<strong>210C</strong><br />

Prepared by:<br />

Cambridge Construction Management

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!