4.26 Maintenance <strong>of</strong> Construction Access Routes<br />
4.27 <strong>Project</strong> Sign<br />
4.28 Maintenance Bond<br />
4.29 Use <strong>of</strong> Premises<br />
4.30 Operation and Maintenance <strong>Manual</strong>s<br />
4.31 Demonstration and Training<br />
Article 5 Subcontractors Page 28<br />
5.1 Contractor-Subcontractor Relationship<br />
Article 6 <strong>Project</strong> Specific Conditions Page 29<br />
6.1 Existing Finishes and Furniture<br />
6.2 Storage <strong>of</strong> Materials and Equipment<br />
6.3 Standby Personnel<br />
Article 7 Temporary Facilities, Utilities, and Services Pages 30-32<br />
7.1 Field Offices<br />
7.2 Storage Sheds, Tool Sheds, Shops, Employee Sheds<br />
7.3 Site Logistics<br />
7.4 Temporary Toilet Facilities<br />
7.5 Temporary Drives and Walks<br />
7.6 Temporary Water<br />
7.7 Temporary Light and Power<br />
7.8 Temporary Heat, Cooling, and Dehumidification<br />
7.9 Temporary Enclosures and Partitions<br />
7.10 Temporary Utility Capping<br />
Article 8 Relationship Between The Contractor and Other <strong>College</strong> Contractors Page 33<br />
8.1 <strong>College</strong>’s Right to Perform Work<br />
8.2 Mutual Responsibility<br />
Article 9 Time Pages 34-40<br />
9.1 Notice to Proceed<br />
9.2 Critical Path Method Scheduling<br />
9.3 Adjustment <strong>of</strong> Contractor Completion Time<br />
9.4 No Damage for Delay<br />
9.5 Time <strong>of</strong> Completion – Liquidated Damages<br />
9.6 Contractor Officer’s Right to Accelerate<br />
Article 10 Payments and Completion Pages 41-46<br />
10.1 Contractor Payments from The <strong>College</strong><br />
10.2 Application for Payments<br />
10.3 Interest<br />
10.4 Substantial Completion<br />
10.5 Use and Possession Prior to Completion (Beneficial Occupancy)<br />
10.6 Final Completion and Payment<br />
Article <strong>11</strong> Uncovering and Construction <strong>of</strong> Work Pages 47-48<br />
<strong>11</strong>.1 Uncovering <strong>of</strong> Work<br />
<strong>11</strong>.2 Correction <strong>of</strong> Work<br />
<strong>11</strong>.3 Acceptance <strong>of</strong> Defective or Nonconforming Work<br />
Article 12 Protection <strong>of</strong> Persons and Property Pages 49-50<br />
12.1 Safety Precautions and Programs<br />