Synthesis of Safety for Traffic Operations - Transports Canada
Synthesis of Safety for Traffic Operations - Transports Canada
Synthesis of Safety for Traffic Operations - Transports Canada
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Intersection Control<br />
TABLE 3.56: <strong>Safety</strong> Impacts <strong>of</strong> Night-time Flashing Operation<br />
Site<br />
Be<strong>for</strong>e<br />
After<br />
)Target<br />
)Total<br />
Months Target Total Months Target Total (crash/month) (crash/month)<br />
M:S LU ST<br />
1 50 15 79 45 8 29 -41 -59 2:1 D F<br />
2 33 5 18 48 0 10 -100 -62 2:1 R S<br />
3 43 8 39 41 5 21 -34 -44 2:1 R F<br />
4 48 8 26 48 3 26 -62 0 Na R F<br />
5 45 12 23 45 2 25 -83 9 2:1 C A<br />
6 48 12 23 48 1 8 -92 -65 1:1 D F<br />
7 58 12 31 80 1 28 -94 -34 5:1 R S<br />
8 46 6 17 43 4 14 -29 -12 2:1 R S<br />
9 82 9 80 78 1 49 -88 -36 2:1 C A<br />
10 22 4 10 22 0 4 -100 -60 4:1 D F<br />
11 48 8 26 48 1 14 -88 -46 1:1 R A<br />
12 48 7 32 48 2 17 -71 -47 3:1 C F<br />
13 49 9 35 47 0 23 -100 -32 3:1 C A<br />
14 46 4 23 46 2 18 -50 -22 1:1 R A<br />
15 51 11 44 49 1 26 -90 -38 2:1 C A<br />
16 46 4 13 45 1 16 -74 26 1:1 R A<br />
17 45 8 25 45 2 32 -75 28 2:1 C A<br />
18 44 5 11 44 1 12 -80 9 4:1 D F<br />
19 36 9 57 36 0 41 -100 -28 3:1 D F<br />
• Targeted Crashes—Targeted Crashes are those crashes expected to be addressed by a particular intervention. In this instance, rightangle<br />
crashes that occurred during the hours the signal was in red/yellow flashing operation.<br />
• % targeted and % total—These refer to the percentage change in targeted and total crashes in the be<strong>for</strong>e and after periods (measured<br />
in crashes/month).<br />
• M:S ratio—This is the ratio <strong>of</strong> main-street to side-street traffic volumes at each intersection.<br />
• LU—This is the Land Use around the intersection: D = Downtown, R = Residential and C = Commercial.<br />
• ST—This is Signal Type: F = Fixed time, S = Semi-actuated and A = Actuated.<br />
TABLE 3.57: <strong>Safety</strong> Effects <strong>of</strong> Night-time Flashing Operation Using a Control<br />
Group<br />
Months<br />
Target Non-target<br />
Crashes Crashes<br />
Be<strong>for</strong>e 888<br />
156 456<br />
0.18/month 0.51/month<br />
After 906<br />
35 378<br />
0.04/month 0.42/month<br />
Page 60