Group/Agency Correspondence Concern/Comment Response<br />

NSW Fire<br />

Brigade<br />

Regional North<br />

2<br />

Email received form<br />

Greg Lewis dated 25<br />

March 2010<br />

From your info supplied I would assume that Country<br />

<strong>Energy</strong>'s work in upgrading the electrical network on the Far<br />

North Coast will involve road disruptions in areas that the<br />

NSWFB Stations below, operate in.<br />

Refer Table 4.1 Roles and Responsibilities (TM.WC.05) which<br />

includes notification by fax <strong>to</strong> impacted Fire Brigade Station<br />

one week prior <strong>to</strong> commencement of road disruptions<br />

I have supplied fax numbers <strong>to</strong> those stations that may be<br />

impacted upon.<br />

Bangalow 02 66872359<br />

<strong>Mullumbimby</strong> 02 66843786<br />

Byron Bay 02 66808289<br />

Als<strong>to</strong>nville 02 66283826<br />

<strong>Lismore</strong> 02 66215481<br />

Goonellabah 02 66252390<br />

Department of<br />

Planning<br />

Letter received from<br />

Scott Jeffries dated<br />

18/05/2010<br />

Can you provide a fax <strong>to</strong> the respective station that might be<br />

impacted upon 1 week prior <strong>to</strong> the work along those roads<br />

commencing. This will give the respective Captains ample<br />

warning <strong>to</strong> inform the drivers of the traffic changes. I would<br />

also expect and hope that the local on site traffic controllers<br />

will work <strong>to</strong> assist NSWFB appliances responding <strong>to</strong><br />

emergencies around these roadworks if and when required.<br />

It should be noted that no Annex C is included in the sub-plan.<br />

Please provide a copy of Annex C with a matrix indicating<br />

how Country <strong>Energy</strong> has responded <strong>to</strong> the comments made by<br />

the relevant road authorities and emergency services, and<br />

where these responses (where included) are located within the<br />

sub-plan. A copy of Annex C must be submitted <strong>to</strong> the<br />

Department.<br />

It is noted that comments from the RTA and Byron Shire<br />

Council on the sub-plan have yet <strong>to</strong> be received. These should<br />

be pursued and included in the documentation.<br />

The Sub-Plan has been revised <strong>to</strong> include evidence of the<br />

Stakeholder consultation undertaken and any responses<br />

received. Refer Table 6.2 and Annex C Stakeholder Consultation<br />

Responses. See also this Matrix.<br />

Responses from the RTA and Byron Shire Council received –<br />

refer comments above. Responses included in Annex C.