Traffic Management Sub-Plan<br />

Uncontrolled when Printed: Revision D<br />

Date: May 2010<br />

Road dilapidation reports will also be prepared on roadways used by heavy<br />

vehicles <strong>to</strong> deliver transformers and receiving a high level of traffic due <strong>to</strong><br />

substation construction activities. This will ensure that road conditions have<br />

not been significantly impacted following the project activities. Road<br />

dilapidation reports are <strong>to</strong> be verified by a representative of the relevant local<br />

council <strong>to</strong> ensure that the road condition post-construction and/or after<br />

construction traffic has ceased is equivalent <strong>to</strong> the standard before the works<br />

commenced. Any works required <strong>to</strong> repair the roadway/footpath <strong>to</strong> this<br />

standard will be at the full expense of Country <strong>Energy</strong>.<br />

The locations across the project where road dilapidation reports are <strong>to</strong> be<br />

produced are listed in Table 8.1.<br />

Table 8.1<br />

Roadways Requiring Road Dilapidation Report<br />

Roadways requiring road<br />

Location<br />

dilapidation report<br />

Wardell Road<br />

Als<strong>to</strong>nville<br />

Kerr Street<br />

Ballina<br />

Fox Street<br />

Ballina<br />

Temple Street<br />

Ballina<br />

Burnett Street<br />

Ballina<br />

Ross Lane<br />

Lennox Head<br />

Newrybar Swamp Road Lennox Head<br />

Gordon Street<br />

Suffolk Park<br />

Yagers Lane<br />

Suffolk Park<br />

Wordsworth Street<br />

Suffolk Park<br />

Somerset Street<br />

Suffolk Park<br />

Butler Street<br />

Suffolk Park<br />

Shirley Street<br />

Suffolk Park<br />

McGettigans Lane<br />

Ewingsdale<br />

Citriadora Drive<br />

Ewingsdale<br />

Vista Drive<br />

Ewingsdale<br />

Ewingsdale Road<br />

Ewingsdale<br />

Wilsons Creek Road<br />

<strong>Mullumbimby</strong><br />

Jubilee Avenue<br />

<strong>Mullumbimby</strong><br />

Dalley Street<br />

<strong>Mullumbimby</strong><br />

Argyle Street<br />

<strong>Mullumbimby</strong><br />

Old Pacific Highway<br />

<strong>Mullumbimby</strong><br />

1. These roadways are shown in yellow on Figures 5.1 <strong>to</strong> 5.6<br />

These reports are then <strong>to</strong> be supplied <strong>to</strong> the relevant road authority(ies). Any<br />

damage caused <strong>to</strong> the road or footpaths, aside form that of normal wear and<br />

tear shall be repaired by Country <strong>Energy</strong>. The damaged infrastructure is <strong>to</strong> be<br />

repaired <strong>to</strong> a standard at least equivalent <strong>to</strong> that existing prior <strong>to</strong> the damage<br />

and <strong>to</strong> the satisfaction of the relevant road authority(ies). Pho<strong>to</strong>graphs are a<br />

useful form of evidence that assist in comparison of the road conditions before<br />

and after the project activities.<br />

ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA DOCUMENT NO. 0051706 TRAFFIC MANAGEMENT/FINAL/28 MAY 2010<br />