27.09.2014 Views

Lismore to Mullumbimby Electricity Network ... - Essential Energy

Lismore to Mullumbimby Electricity Network ... - Essential Energy

Lismore to Mullumbimby Electricity Network ... - Essential Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA DOCUMENT NO. 0051706 TRAFFIC MANAGEMENT/FINAL/28 MAY 2010<br />

68<br />

Environmental Issue Management Strategy Responsibility Sub Plan/CE<br />

Procedure<br />

Safety of Road Users<br />

and Construction<br />

Staff<br />

Signs<br />

The type of signs that will be used for traffic management during the proposed line<br />

upgrade activities will include:<br />

• Road work signs <strong>to</strong> inform of temporary hazardous conditions that could be<br />

encountered (ROADWORKS AHEAD, END ROADWORKS);<br />

• Guide signs <strong>to</strong> show road users the correct path <strong>to</strong> follow (DETOUR,<br />

PEDESTRIANS);<br />

• Regula<strong>to</strong>ry signs indicating the laws that shall be obeyed (approval is required<br />

for the erection of such a sign); and<br />

• Warning signs providing road users with forewarning of future road<br />

conditions that require caution.<br />

Signs shall be manufactured and designed in accordance with AS 1743 Road signs -<br />

Specifications.<br />

Sequence for Erection of Signs<br />

Before any project activities located near roadways are <strong>to</strong> commence, signs and devices<br />

at approaches <strong>to</strong> the work area are <strong>to</strong> be erected in accordance with the site TCP. When<br />

placing the signs and devices, a work vehicle with flashing lights will be positioned<br />

between the workers and approaching traffic. The vehicle should always travel in the<br />

direction of normal traffic flow. Removal of the signs and devices will be undertaken in<br />

the reverse order of erection, progressing from the work area out <strong>to</strong>ward the work area<br />

approaches.<br />

Works Coordina<strong>to</strong>r<br />

CEM2328 Traffic<br />

Control: Safety

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!