ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA DOCUMENT NO. 0051706 TRAFFIC MANAGEMENT/FINAL/28 MAY 2010<br />

60<br />

Table 6.1<br />

Traffic Management Measures<br />

Environmental Issue Management Strategy Responsibility Sub Plan/CE<br />

Procedure<br />

Delays <strong>to</strong> traffic<br />

• To ensure minimum disruption and inconvenience <strong>to</strong> road users close only the<br />

minimum length and width of a road that is absolutely necessary <strong>to</strong> undertake<br />

the works in a safe manner at each stage of construction;<br />

• Minimise the use of local roads (through residential streets and <strong>to</strong>wn centres)<br />

<strong>to</strong> gain access <strong>to</strong> construction sites;<br />

• Busy roads and central business districts will be avoided where possible <strong>to</strong><br />

minimise idling and queuing in local residential streets and <strong>to</strong>wn centres;<br />

• Adhere <strong>to</strong> haulage routes and road networks listed in Section 5.4.<br />

• In locations where a transmission line is <strong>to</strong> cross roadways, make all possible<br />

attempts <strong>to</strong> safely install the line without closing the roadway.<br />

• Audible work at the nearest sensitive receiver is <strong>to</strong> be undertaken during the<br />

approved construction times and programmed where necessary <strong>to</strong> ensure<br />

minimum disruption <strong>to</strong> traffic especially during the following times:<br />

• peak times;<br />

• Saturdays;<br />

• school holidays; and<br />

• special events.<br />

• Road closures will only be short term up <strong>to</strong> a maximum of 15 minutes <strong>to</strong> allow<br />

delivery of large plant items. In the case of Skinners Shoot Road and Yagars<br />

Lane, road works will ensure a single lane is open for traffic movement under<br />

traffic control. Access for emergency vehicles during short term road closure<br />

will be established between Yagars Lane and Bangalow Road via an existing<br />

private property access track in consultation with the relevant landowner.<br />

Works Coordina<strong>to</strong>r<br />

CEM2328 Traffic<br />

Control: Safety