Lismore to Mullumbimby Electricity Network ... - Essential Energy
Lismore to Mullumbimby Electricity Network ... - Essential Energy
Lismore to Mullumbimby Electricity Network ... - Essential Energy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Group/Agency Correspondence Concern/Comment Response<br />
The Departments comments of 30 March 2010 indicated that<br />
no details have been provided as <strong>to</strong> the measures <strong>to</strong> be<br />
employed where <strong>to</strong>tal road closures are required and de<strong>to</strong>urs<br />
not a viable option. It is noted that a footnote has been inserted<br />
under Table 5.1 which states that “should <strong>to</strong>tal road closure be<br />
necessary, the duration of the road closure will be less than 15<br />
minutes.” Please confirm that this outcome has been presented<br />
<strong>to</strong>, and is acceptable <strong>to</strong>, the relevant road authorities and<br />
emergency services.<br />
Potential road closures are primary concern of most<br />
stakeholders with notification primary concern. Responsibility<br />
<strong>to</strong> notify the relevant stakeholders is detailed in Table 4.1.<br />
Prior <strong>to</strong> any road closures a Traffic Control Plan will be<br />
prepared in consultation with RTA and affected Local Council.<br />
Closures of Pacific and Bruxner Highway will also include<br />
development of Vehicle Management Plan as recommended<br />
by Ballina Council. Once any road closures are deemed<br />
necessary, these plans will be developed. Annex A details<br />
Country <strong>Energy</strong>’s procedures used throughout NSW in<br />
cooperation with the RTA and local councils.