Traffic Management Sub-Plan<br />
Uncontrolled when Printed: Revision D<br />
Date: May 2010<br />
TM.SS.06<br />
TM.SS.07<br />
TM.SS.08<br />
TM.SS.09<br />
TM.SS.10<br />
TM.SS.11<br />
TM.SS.12<br />
TM.SS.13<br />
PPM.SS.14<br />
Adhere <strong>to</strong> the Construction Vehicle Code of Conduct<br />
detailed in the TM Sub-plan.<br />
Undertake road dilapidation reports for all roads<br />
nominated in the TM Sub-plan that are likely <strong>to</strong> be<br />
used by construction traffic.<br />
Undertake upgrade works along Skinners Shoot Road<br />
and Yagers Lane <strong>to</strong> the standard necessary <strong>to</strong> provide<br />
all-weather access, including a trafficable surface<br />
suitable <strong>to</strong> accommodate heavy vehicles movements<br />
associated with the construction and operation of the<br />
project.<br />
Remove local traffic de<strong>to</strong>urs and reinstate preexisting<br />
road network and access arrangements <strong>to</strong> the<br />
satisfaction of the relevant road authority(ies).<br />
Consult with each landholder whose property is<br />
directly impacted by the project regarding the terms<br />
and conditions relating <strong>to</strong> access arrangements for<br />
construction activities on their land.<br />
Ensure that primary access routes <strong>to</strong> and from<br />
properties are kept open for the duration of<br />
construction works or alternative access is provided<br />
Utilise construction techniques that allow for the<br />
erection and ongoing maintenance of the lines <strong>to</strong> be<br />
carried out with minimal disruption <strong>to</strong> traffic.<br />
Ensure that TCPs are prepared and implemented<br />
when working in designated Project areas.<br />
Directions associated with the CEMP, the PPM Subplan,<br />
and approvals (if required) are adhered when<br />
working in designated Project areas <strong>to</strong> the satisfaction<br />
of the Project Environmental Coordina<strong>to</strong>r.<br />
Traffic Control Site Supervisor<br />
During<br />
Construction.<br />
Prior <strong>to</strong><br />
commencement and<br />
after completion of<br />
construction<br />
Prior <strong>to</strong><br />
commencement of<br />
works at Suffolk<br />
Park Substation<br />
As soon as<br />
practicable<br />
following<br />
completion of<br />
works<br />
Prior <strong>to</strong><br />
commencement of<br />
works<br />
Prior <strong>to</strong><br />
commencement of<br />
works<br />
During<br />
Construction.<br />
At all times.<br />
At all times<br />
Action No. Management Procedure Timing<br />
TM.TC.01<br />
Identify all work sites requiring a TCP in accordance<br />
with the requirements TM Sup-plan.<br />
Prior <strong>to</strong><br />
commencement of<br />
works<br />
TM.TC.02<br />
TM.TC.03<br />
TM.TC.04<br />
TM.TC.05<br />
TM.TC.06<br />
Prepare and gain necessary approvals of TCPs from<br />
the RTA or Council in accordance with the<br />
requirements TM Sup-plan.<br />
Keep a record of the TCP that was used on Country<br />
<strong>Energy</strong> Hazards Identification Risk Assessment and<br />
Control (HIRAC) form and keep a copy of all TCPs<br />
on-site.<br />
In relation <strong>to</strong>o the preparation and implementation of<br />
TCPs, perform inspections before work starts, during<br />
the works and pre-closedown of the site. Check<br />
periodically that all signs and devices are satisfac<strong>to</strong>ry<br />
and in their correct position.<br />
Consult and supervise with any contrac<strong>to</strong>rs that are<br />
conducting traffic control at worksites.<br />
Notify the nearest Police Station of any traffic control<br />
that will be in effect and the expected duration each<br />
Prior <strong>to</strong><br />
commencement of<br />
works<br />
At all times.<br />
At all times.<br />
At all times.<br />
Prior <strong>to</strong><br />
commencement of<br />
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA DOCUMENT NO. 0051706 TRAFFIC MANAGEMENT/FINAL/28 MAY 2010<br />