Traffic Management Sub-Plan<br />

Uncontrolled when Printed: Revision D<br />

Date: May 2010<br />

5.13 PACIFIC HIGHWAY UPGRADE<br />

The Pacific Highway upgrade project is currently under construction <strong>to</strong> the<br />

west of Ewingsdale, travelling south through <strong>to</strong> west of Ballina. This<br />

potentially has significant impacts <strong>to</strong> the transmission line project works due<br />

<strong>to</strong> the alteration of existing road networks and traffic conditions and large<br />

construction areas that may impact access <strong>to</strong> the transmission line <strong>to</strong> be<br />

upgraded. Near Ballina, the transmission line is <strong>to</strong> be upgraded in several<br />

locations in the immediate vicinity of the Pacific Highway project area. Coordination<br />

with the RTA and relevant contrac<strong>to</strong>rs will be essential when in<br />

these locations <strong>to</strong> ensure the progression of the project is not hampered.<br />

5.14 ALSTONVILLE BYPASS<br />

The Als<strong>to</strong>nville Bypass is 6.2km of roadway between Als<strong>to</strong>nville and<br />

Wollongbar. The bypass will commence at Sneaths Road Wollongbar and will<br />

rejoin the Bruxner Highway at the Tropical Fruit Research Station at Perrys<br />

Hill, east of Als<strong>to</strong>nville. Construction activities commenced in mid 2009 and<br />

are continuing at present. The construction activities have the potential <strong>to</strong><br />

interact with the electricity upgrade project in the areas between Wardell<br />

Road and Teven Road (See Figure 5.7). On-going consultation with the RTA<br />

and relevant contrac<strong>to</strong>rs prior <strong>to</strong> and throughout the project construction<br />

works is recommended.<br />

ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA DOCUMENT NO. 0051706 TRAFFIC MANAGEMENT/FINAL/28 MAY 2010<br />