deferred to divert these funds back to essential maintenance<br />

works.<br />

So far, we have done much better than the national averages in all<br />

areas of our road performance assessment measures (roughness,<br />

smoothness and road integrity). We expect to remain above<br />

national average in these areas throughout the ten year period<br />

covered by this plan, given that all Road Controlling Authorities<br />

have been affected financially and more importantly, that we are<br />

not watching and waiting, but rather taking proactive steps to<br />

mitigate loss of asset life through rational and judicious decision<br />

making. We will continue to monitor our key performance<br />

indicators for road condition to establish if there is any loss<br />

of predicted asset life and the extent of any decline in levels<br />

of service. Over a long period of time, if our funding continues<br />

to be significantly less that our AMPs indicate, levels of service<br />

will gradually decrease. Increasing rates for roads in the future<br />

may be the only way to maintain current levels of service, or we<br />

could accept that a reduced level of service is necessary and<br />

decide what that will be.<br />

This is a problem we are not facing alone. Nationally, there are<br />

investigations into how we establish the point of critical failure<br />

for our roads so that we are able to proactively intervene. At<br />

this stage, we do not have the answers, but expect that this will<br />

continue to be a key issue when we review our long term plan<br />

again in three years. By then, with continued monitoring and<br />

exploring the how we can continue to do more for less, as well<br />

as on-going national discussion on this topic, we will have more<br />

information and options for consideration going forward.<br />

We have been undertaking only minor seal extensions over<br />

the past few years. The last major work was carried out on<br />

Woodbank Road, completed in 2010. We plan to take advantage<br />

of any external funds available or funding opportunities through<br />

the Road Seal Extensions Policy to reduce the length of unsealed<br />

roads in the district. Other processes for dust suppression<br />

will continue to be investigated. Bridge maintenance and<br />

replacements are also a priority focus during the next several<br />

years.<br />

Many timber bridges built after World War II are now nearly<br />

at the end of their economic lives, and will have to be replaced<br />

during the life of this plan. We have been working through a<br />

bridge replacement plan according to the priorities established<br />

after we contracted OPUS to investigate the state of our<br />

bridges in 2009. To date priority bridges which include Lyndon<br />

No.3 Bridge (Lyndon Road), MacFarlanes Bridge (Conway Flat<br />

Road), Humpback Bridge (Gore Bay Road), Williams Bridge<br />

(Glenmark Drive), Coops Bridge (Parkview Road), Gola Peaks<br />

Bridge (Virginia Road), Charwell No. 1 Bridge (Stag and Spey<br />

Road), Thompsons Bridge (Glenmark Drive) and Jamiesons<br />

Bridge (Megowans Road) have been completed.<br />

Bridges targeted for the <strong>2012</strong>/2015 period include Broxton<br />

Bridge (Broxton Road), Mandamus Bridge (Tekoa Road), Lower<br />

<strong>Hurunui</strong> Swing Bridge (Blythe Road), Okuku Pass Bridge<br />

(Okuku Pass Road), Uphams Bridge (Conway Flat Road), Mid<br />

Waipara Bridge (Greys Road), Blythe No.1 Culvert (Blythe<br />

Road), Crossleys Bridge (Leader Road East), Brophys Bridge<br />

(Brophys Road), Armco Culvert (Ngaroma Road), Jacks Creek<br />

(Lake Sumner Road). Because of the significant costs associated<br />

with bridge maintenance and improvements, it may be a better<br />

solution to replace bridges with fords instead, subject to location<br />

and traffic counts. This will only be considered where there is<br />

low traffic volume and few people affected (sometimes there<br />

is only one household). Consultation with relevant people and<br />

sectors of the community will be done before any decisions<br />

such as this are made. A budget provision has been made for<br />

the bridge repairs.<br />

We have been working through a programme of installing School<br />

Active Warning Signs where schools are positioned on busy<br />

roads. Warning signs have been installed for Amberley, Cheviot,<br />

Amuri, Leithfield, Rotherham, Broomfield, Waiau, Waikari<br />

and Greta Valley Schools. Further signs are programmed for<br />

<strong>Hurunui</strong> College, Hanmer Springs, Waipara and Omihi during<br />

<strong>2012</strong>/2015, at an approximately cost of $7,500 per sign.<br />

Roading challenges coming up include:<br />

• Binding up of metal material to unsealed roads so that they<br />

are sustainable and durable<br />

• Blending of metals to improve structural strength and<br />

enhanced mosaic aggregate interlocking<br />

• Improved open drains for land drainage requirements<br />

• Deciding on effective sealed road widths for improved traffic<br />

conveyance, and ways to reduce maintenance expenditure<br />

Funding Model<br />

Roads<br />

Operational Costs:<br />

• <strong>Council</strong>’s contribution is 100% <strong>District</strong> Rate for operations,<br />

roads and bridges known as the ‘Roading Rate’<br />

Capital Costs:<br />

• Capital improvements above $100,000 may be funded<br />

by reserves or loans pursuant to the <strong>Council</strong>’s Internal<br />

Financing Policy<br />

• Other Capital Expenditure to be funded as operational<br />

• If a community wants new sealing work done that does not<br />

qualify for a government subsidy, the Road Seal Extension<br />

policy allows for ratepayers to meet 50% of the costs,<br />

with the <strong>Council</strong> contributing the remaining 50% from the<br />

General Rate<br />

• If any of the Capital Expenditure caters for future growth,<br />

then that portion of the expenditure that relates to growth<br />

may be funded from future users via Financial Contributions<br />

Footpaths<br />

Operational Costs:<br />

• Township maintenance 100% local amenity rate on ward or<br />

community rating area<br />

Capital Costs:<br />

• Township maintenance 100% local amenity rate on ward or<br />