www.hurunui.govt.nz<br />

<strong>Council</strong> Owned Assets<br />

Land drainage schemes:<br />

• Ashworths drains<br />

• Leithfield Outfall drain<br />

• Newcombes Road drains<br />

• Jed River drains<br />

Maintenance and Operating Implications<br />

We plan to continue to maintain the 4 drainage systems as well<br />

as other drainage channels created as part of the improvement<br />

works described above. Annual maintenance has been limited to<br />

occasional drain clearing. Contractors will be engaged to carry<br />

out regular work to maintain the system as and when needed.<br />

Assumptions and Risks<br />

It is assumed that both global consent applications (Amberley<br />

and Hanmer Springs) will be approved and that land-owner<br />

approvals will be given to allow the flood mitigation construction<br />

works to proceed.<br />

<strong>Community</strong> Outcomes<br />

1. A desirable and safe place to live<br />

2. A place with essential infrastructure<br />

Goals and Performance Measures<br />

Goals<br />

Minimise the risk of<br />

flooding<br />

How we will achieve our<br />

Goals<br />

Maintain all drainage<br />

systems in accordance with<br />

resource consent conditions<br />

Employ an engineer to<br />

manage the stormwater and<br />

drainage portfolio<br />

Performance Measures Current Situation 11/12 12/13 13/14 14/15 15+<br />

All major and significant<br />

non-compliances for our<br />

stormwater resource<br />

consents reduce until we<br />

have 0% non-compliance<br />

<strong>District</strong> wide stormwater<br />

catchment and management<br />

plans have been put<br />

in place<br />

We have 30 resource<br />

consents relating to<br />

stormwater, which have 363<br />

conditions to comply with.<br />

We have had 0% major and<br />

significant non-compliance so<br />

far this year.<br />

We have a stormwater plan<br />

for the Amberley area but<br />

not for the other areas in the<br />

district<br />

2% 1% 0% 0%<br />

√<br />

Financial Summary<br />

A financial summary for this activity is shown on the next page.<br />

92