www.hurunui.govt.nz<br />
<strong>Council</strong> Owned Assets<br />
Land drainage schemes:<br />
• Ashworths drains<br />
• Leithfield Outfall drain<br />
• Newcombes Road drains<br />
• Jed River drains<br />
Maintenance and Operating Implications<br />
We plan to continue to maintain the 4 drainage systems as well<br />
as other drainage channels created as part of the improvement<br />
works described above. Annual maintenance has been limited to<br />
occasional drain clearing. Contractors will be engaged to carry<br />
out regular work to maintain the system as and when needed.<br />
Assumptions and Risks<br />
It is assumed that both global consent applications (Amberley<br />
and Hanmer Springs) will be approved and that land-owner<br />
approvals will be given to allow the flood mitigation construction<br />
works to proceed.<br />
<strong>Community</strong> Outcomes<br />
1. A desirable and safe place to live<br />
2. A place with essential infrastructure<br />
Goals and Performance Measures<br />
Goals<br />
Minimise the risk of<br />
flooding<br />
How we will achieve our<br />
Goals<br />
Maintain all drainage<br />
systems in accordance with<br />
resource consent conditions<br />
Employ an engineer to<br />
manage the stormwater and<br />
drainage portfolio<br />
Performance Measures Current Situation 11/12 12/13 13/14 14/15 15+<br />
All major and significant<br />
non-compliances for our<br />
stormwater resource<br />
consents reduce until we<br />
have 0% non-compliance<br />
<strong>District</strong> wide stormwater<br />
catchment and management<br />
plans have been put<br />
in place<br />
We have 30 resource<br />
consents relating to<br />
stormwater, which have 363<br />
conditions to comply with.<br />
We have had 0% major and<br />
significant non-compliance so<br />
far this year.<br />
We have a stormwater plan<br />
for the Amberley area but<br />
not for the other areas in the<br />
district<br />
2% 1% 0% 0%<br />
√<br />
Financial Summary<br />
A financial summary for this activity is shown on the next page.<br />
92