10.07.2015 Views

Core Strategy Options - Dorsetforyou.com

Core Strategy Options - Dorsetforyou.com

Core Strategy Options - Dorsetforyou.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Core</strong> <strong>Strategy</strong> <strong>Options</strong>Christchurch and East Dorset Employment Land Review (2007).Christchurch and East Dorset <strong>Core</strong> <strong>Strategy</strong> Habitats Regulations Assessment (LUC, 2010)7.49 Issue: Which part of the Airport do you think should be released from the Green Belt?Preferred Option BA 3Only land required to meet the operational needs of the airport should be removed from theGreen Belt (Option 1, Preferred)Why is it a Preferred Option?This option allows greatest flexibility to meet the operational needs of the airport withinenvironmental limits.Amendments to the Green Belt boundary removes a constraint to further development of theoperational airport. Future growth of the airport will increase aircraft and car traffic which mayeffect air quality. Mitigation measures include sub-regional tree planting, measures to reducethe need to travel including improvements to public transport, use of renewable energysources and sustainable standards of construction.Does it conform to the rules, regulations and advice?NationalYesLocalYesIs it informed by evidence?Yes<strong>Core</strong> <strong>Strategy</strong> <strong>Options</strong> September 29th, 2010 Christchurch and East Dorset Council Meetings123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!