10.07.2015 Views

Core Strategy Options - Dorsetforyou.com

Core Strategy Options - Dorsetforyou.com

Core Strategy Options - Dorsetforyou.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Core</strong> <strong>Strategy</strong> <strong>Options</strong>13 CreatingHigh QualityandDistinctiveEnvironmentsHE 6PreferredOptionInChristchurchtheBorough-wideCharacterAssessmentwill continueto preservedecisionsregardingprotectionof characterandappropriatedesigncontrol, andwill beupdatedwithin theplan periodEnsureproposalsfordevelopmentmaintain thecharacter<strong>Core</strong><strong>Strategy</strong>DevelopmentManagementPolicies-CBCand EastDorset DCChristchurchBoroughCouncil,externalconsultantsReviewfunded byChristchurchBC13 CreatingHigh QualityandDistinctiveEnvironmentsHE 5Introductionof an UrbanDesignGuide inEast DorsetDevelopmentwill maintainthecharacter ofthe district<strong>Core</strong><strong>Strategy</strong>East DorsetDCProductionof Guidefunded byEast DorsetDC14 MeetingLocalNeedsLN 6Design andlayout ofnew homesshouldmaximisethe densityofdevelopmentto a levelwhich isacceptableDevelopmentwill maintainthecharacter ofthe district<strong>Core</strong><strong>Strategy</strong>Christchurchand EastDorsetCouncils -determinationof planningapplicationsN/A17.7 Objective 3, To adapt to the challenges of climate change-The impact of carbonemissions from transport will be reduced by more sustainable patterns of development in accessiblelocations, and by encouraging travel by bike, on foot, or by public transport. Developments will beexpected to incorporate carbon reduction, water and energy efficiency measures as part ofmeasures to reduce impact on climate change. At least 10% of total energy used on developmentsof 10 or more dwellings and over 1,000m2 of non-residential floorspace will <strong>com</strong>e from decentralised,renewable or low carbon sources. Development will be located in areas at lowest risk of floodingas required by PPS25. A Supplementary Planning Document for Flood Risk will be produced inChristchurch on how the sequential and exception tests will apply locally.336September 29th, 2010 Christchurch and East Dorset Council Meetings <strong>Core</strong> <strong>Strategy</strong> <strong>Options</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!