<strong>Analyzer</strong> Preparation<br />

Mounting and<br />

Plumbing Instructions<br />

Recommendations<br />

Instructions<br />

Thermo Scientific <strong>Orion</strong> <strong>2117HL</strong> <strong>High</strong> <strong>Level</strong> <strong>Chloride</strong> <strong>Analyzer</strong> <strong>User</strong> <strong>Guide</strong><br />

Refer to the Appendix, Mounting Dimensions section.<br />

Warning: Do not connect power prior to the mounting and plumbing of<br />

the analyzer.<br />

• Select a site for the analyzer that allows it to be permanently bolted<br />

with ample height for atmospheric drain operation. Be sure that there is<br />

ready access to the electronic controls, calibration port and electrodes.<br />

• A clearance of 15 inches (about 40 cm) must be allowed above the<br />

flow cell calibration port. Insert the pipet vertically (not angled) during<br />

the calibration.<br />

• The analyzer location must permit connections to a sample line, drain<br />

and AC power supply and any connections for output devices.<br />

• The analyzer should be mounted as close to the sampling point as<br />

possible. This ensures the fastest possible response to a changing sample<br />

condition. Refer to the Appendix, Sample Conditions section.<br />

• For proper flow cell operation, the analyzer must be installed straight<br />

and level upon its mounting location. Failure to level the analyzer may<br />

cause poor siphoning in the flow cell.<br />

1. Prepare the mounting holes. Carefully lift the analyzer and bolt it into<br />

place. Do not lift the analyzer by holding on to any of the plumbing or<br />

fluid handling components.<br />

2. Connect a waste line to the outlet of the analyzer, which is 3⁄4 NPT<br />

male. The waste line should be connected to a drain of sufficient<br />

capacity, 0.5 inch (1.27 cm) OD is recommended.<br />

3. Connect a sample line to the inlet of the analyzer, which is 1⁄4 NPT<br />

female. It is recommended that a shutoff valve be installed at the<br />

sampling point.<br />

4. The analyzer must be mounted and leveled vertically for proper<br />

operation.<br />

II-2