13.07.2015 Views

47.5 MB - The Whole Building Design Guide

47.5 MB - The Whole Building Design Guide

47.5 MB - The Whole Building Design Guide

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 3-60:View of the underside ofa steel deck showing themechanically attachedsingle-ply membranefastener rows runningparallel to, instead ofacross, the top flange ofthe deck.For metal panel roof systems, the following are recommended:m When clip or panel fasteners are attached to nailers, detail theconnection of the nailer to the nailer support (including thedetail of where nailers are spliced over a support).m When clip or panel fasteners are loaded in withdrawal(tension), screws are recommended in lieu of nails.m For concealed clips over a solid substrate, it is recommendedthat chalk lines be specified so that the clips are correctlyspaced.m When the basic wind speed is 110 mph or greater, it isrecommended that two clips be used along the eaves, ridges,and hips.m For copper panel roofs in areas with a basic wind speed greaterthan 90 mph, it is recommended that Type 316 stainless steelclips and stainless steel screws be used in lieu of copper clips.m Close spacing of fasteners is recommended at hip and ridgeflashings (e.g., spacing in the range of 3 to 6 inches on center,commensurate with the design wind loads.)MAKING CRITICAL FACILITIES SAFE FROM High Wind3-75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!