13.07.2015 Views

47.5 MB - The Whole Building Design Guide

47.5 MB - The Whole Building Design Guide

47.5 MB - The Whole Building Design Guide

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 3-118:<strong>The</strong> antenna at thishospital collapsed andwas whipped back andforth across the roofmembrane. HurricaneAndrew (Florida, 1992)3.6.3.2 Lightning Protection SystemsAdhesively-attached conductor connectors and pronged spliceconnectors typically have not provided reliable attachment duringhurricanes. To provide more reliable attachment for LPS locatedin hurricane-prone regions where the basic wind speed is 100 mphor greater, or on critical facilities in excess of 100 feet above grade,it is recommended that attachment modifications based on theguidance given in Section 3.3.4.3 be used.<strong>The</strong> recommendations given in Section 3.6 are summarized inTable 3-7.MAKING CRITICAL FACILITIES SAFE FROM High Wind3-145

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!