13.07.2015 Views

47.5 MB - The Whole Building Design Guide

47.5 MB - The Whole Building Design Guide

47.5 MB - The Whole Building Design Guide

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 4-47:Generator mounted atgrade level damaged byflooding<strong>The</strong> need to provide a back-up generator at a safe and elevated locationis confirmed by the experiences during Hurricane Katrina.Many facilities were without power because of the low elevationand subsequent flooding of their generators. Jackson County EOChad its emergency power station elevated and protected in a separateenclosure, which allowed the facility to operate withoutinterruption (see Figure 4-48).Figure 4-48:Jackson County EOC’selevated generatorenclosure4-64 OBSERVATIONS ON THE PERFORMANCE OF CRITICAL FACILITIES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!