13.07.2015 Views

47.5 MB - The Whole Building Design Guide

47.5 MB - The Whole Building Design Guide

47.5 MB - The Whole Building Design Guide

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.4.6 Post-<strong>Design</strong> ConsiderationsIn addition to adequate design, proper attention must be given toconstruction, post-occupancy inspection, and maintenance.3.4.6.1 Construction Contract AdministrationIt is important for owners of critical facilities in hurricane-proneregions to obtain the services of a professional contractor whowill execute the work described in the contract documents ina diligent and technically proficient manner. <strong>The</strong> frequency offield observations and extent of special inspections and testingshould be greater than those employed on critical facilities thatare not in hurricane-prone regions.3.4.6.2 Periodic Inspections, Maintenance, andRepair<strong>The</strong> recommendations given in Section 3.3.1.4 for post-occupancyand post-storm inspections, maintenance, and repair arecrucial for critical facilities in hurricane-prone regions. Failureof a building component that was not maintained properly, repairedor replaced, can present a considerable risk of injury ordeath to occupants, and the continued operation of the facilitycan be jeopardized.<strong>The</strong> recommendations given in Section 3.4 are summarized inTable 3-4.3-124 MAKING CRITICAL FACILITIES SAFE FROM High Wind

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!