13.07.2015 Views

Annual Report 2010 - Ministry of Finance and Planning

Annual Report 2010 - Ministry of Finance and Planning

Annual Report 2010 - Ministry of Finance and Planning

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Ministry</strong> <strong>of</strong> <strong>Finance</strong> <strong>and</strong> <strong>Planning</strong> Sri Lanka > <strong>Annual</strong> <strong>Report</strong> <strong>2010</strong>Road Sector Assistance ProjectIDA - USD 198 millionDuration – 2005 - 2011Resurfacing <strong>of</strong> 620km <strong>of</strong> national roads: Galle-Deniyaya, Padeniya-Puttalam,Haliella-B<strong>and</strong>arwela, B<strong>and</strong>arawela-Welimada, Madawachchi-Poonawa,Nittambuwa-K<strong>and</strong>y, Maradankadawela-Thirukondaimadu <strong>and</strong> Wellawaya-Siyambal<strong>and</strong>uwa-Ampara-Karaitivu.Pro-poor Eastern InfrastructureDevelopment ProjectJICA - USD 50 millionDuration – 2007 - 2011Rehabilitaion <strong>of</strong> 100km <strong>of</strong>Akkaraipattu-Batticaloa-Trikk<strong>and</strong>imaduRoad <strong>and</strong> 290 meter long bridge atKallady.National Highway Sector ProjectADB & OPEC - USD 158 millionDuration – 2007 - 2012Rehabilitation <strong>of</strong> Puttalam-Anuradhapura, Habarana-Kantale,Udatenna–Mahiyangana, NuwaraEliya–Badulla <strong>and</strong> Vilasitha Nivasa-Homagama <strong>of</strong> Colomb –RatnapuraRoadConstruction <strong>of</strong> NewMannar BridgeJICA - USD 16 millionDuration – 2008 - <strong>2010</strong>157 meter length <strong>of</strong> bridge <strong>and</strong> 3kmlong causeways have been reconstructed<strong>and</strong> opened for public inMarch <strong>2010</strong>.Trincomalee IntegratedInfrastructure ProjectAFD – Euro 65 millionDuration – 2006 - 2011Reconstruction <strong>of</strong> 98km <strong>of</strong> A15road from Thirukkondiamadu toTrincomalee, 41km <strong>of</strong> Allai–Kantale–Serunuware <strong>and</strong> 12km <strong>of</strong> coastal roadwhich joins A15 <strong>and</strong> construction<strong>of</strong> five major bridges at Kayankerni,Verugal, Upparu, Gangei <strong>and</strong> Ralkuli.Improvement <strong>of</strong>Padeniya-Anuradhapura RoadProjectEDCF - USD 55 millionDuration – 2009 - 2012The project includes widening<strong>and</strong> improvement <strong>of</strong> 80.8km longPadeniya–Anuradhapura road withtwo lanes, <strong>and</strong> with four lanes intown areas.Construction <strong>of</strong> Bridges <strong>and</strong>FlyoversUK – USD 101.8 millionAustria – USD 14.4 millionSpain – USD 29.5 millionDuration – 2006 - 2011Construction <strong>of</strong> four flyovers inColombo <strong>and</strong> 116 bridges such asKatugastota, Bentota, Sangupiddy <strong>and</strong>Irakk<strong>and</strong>y.257

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!