KVPT’s Patan Darbar Earthquake Response Campaign - Work to Date - September 2016

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Char Narayana Temple<br />

Repair / res<strong>to</strong>ration of the southern<br />

portal.<br />

Pho<strong>to</strong>graphs Anil and Bijay Basukala,<br />

May 24, 26 and June 5 and 8, <strong>2016</strong><br />

Top Left<br />

Replacement of the threshold of the<br />

principal doorway.<br />

Bot<strong>to</strong>m Right<br />

Partial replacement of the lower<br />

part of the cusped arch of the doorway<br />

<strong>to</strong> the left.<br />